background image

 

©2020 U.S. Solar Mounts Corp.  All Rights Reserved

 

 

1.

 

Position the Upper & Lower Support Arms as shown 
in Figure 1 to the right.   

2.

 

Slide  the  Arms together so that the alignment slots 
are fully engaged.   

3.

 

Set the assembled Arms onto the Base and align the 
mounting holes.   

4.

 

Insert 8 Carriage Bolts from the bottom of the base 
upward through the bent feet. 

5.

 

Install a Serrated-Flange Nut onto all 8 Bolts. 

6.

 

Tighten all hardware securely. 

 

 

DB-36-B Assembly Instructions REV1

 

 

 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Package Contents 

Aeration Bubble Tube 

Hose Clamp 

Check Valve Assembly 

10 

10-

24 x ½” Carriage Bolt

 

10 

10-24 Serrated Flange Nut 

Base 

Hose Strain Relief Clamp 

Lower Support Arm 

Upper Support Arm 

 

 

E

 

 

D

 

 

F

 

 

I

 

 

A

 

 

B

 

 

C

 

 

H

 

 

G

 

Figure 1 

Reviews: