![U-Line H-2449 Assembly Download Page 1](http://html1.mh-extra.com/html/u-line/h-2449/h-2449_assembly_3147237001.webp)
0313 IH-2449
PAGE 1 OF 3
GARMENT STORAGE
CENTER WITH SHELVES
H-2449
PARTS
ASSEMBLY
Connector x 6
36 x 18" Shelf x 1
Tall Post Top x 6
Tall Post Bottom x 6
18 x 18" Shelf x 12
Shelf Support (52 Sets)
Garment Rod x 1
Self-leveler x 8
Garment Rod Hanger x 2
Short Post x 2
Figure 1
Figure 2
POST ASSEMBLY
1. Connect tall post tops and tall post bottoms to each
other by screwing them together. (See Figure 1)
NOTE: Tall post tops have a black plastic cap in
the top of the post.
TO INSTALL SELF-LEVELERS
1. Make sure post is positioned as shown. (See Figure 2)
2. Insert self-leveler into open end of post. Tap on
ground to slide self-leveler into post.
3. Repeat step 2 for all other posts.
TO INSTALL OPTIONAL CASTERS
1. Make sure post is positioned as shown. (See Figure 3)
2. Engage the wheel brakes to keep casters from
rolling during assembly. Use a rubber mallet to tap
caster stem into posts. (See Figure 3)
Figure 3