background image

0521 IH-2035

PAGE 1 OF 3

H-2035 

SHRINK TUNNEL 

LEG KIT

1-800-295-5510

uline.com

NOTE: Leg kit works with both US model H-2034 
and Canada model H-4018.

CAUTION! Assembling the leg kit to the 
conveyor can be dangerous. Two people or 
a mechanical lift device must be used to 

position the conveyor above the leg kit until 
they are attached.

SETUP INSTRUCTIONS

1.  Remove the leg kit from the crate. Inspect for 

damage. 

2.  To adjust leg length, remove shipping bolts from legs 

(1 bolt per leg). Adjust leg length by measuring the 

desired height and subtracting 12" to account for 

the conveyor and caster height.

3.  Place legs upside down on floor. Position shelf on 

legs. Insert socket screws through shelf and each leg 

from outside (7 places per leg). Tighten screws with 

flat washers, lock washers and nuts. Use a socket 

wrench. (See Figure 1)

4.  Screw feet into threaded holes provided on bottom 

of the shelf. Insert casters into nylon insert next to 

feet. (See Figure 2)

5.  Turn the leg kit right side up. Place conveyor on top 

of the leg kit assembly. Insert hex bolts through the 

conveyor and leg kit (2 bolts per corner). Tighten 

bolts with flat washers, lock washers and nuts.  

(See Figure 3)

LEG KIT INSTALLATION AND SETUP

Figure 1

Figure 3

Para Español, vea página 2.

Pour le français, consulter la page 3.

Outside

Hex 

Bolt

Socket Screw

Upside Down View

Socket Screw

Hex 

Bolt

Figure 2

Reviews: