1
Introduction
This manual provides guidance for the installation of Red-E Cabinet DV-5A integrated fire protection
packages. The installation procedure does not cover the testing and commissioning of the system.
The entire sprinkler system including this integrated package must be tested before placing the
system in operation. A competent fire protection technician should do testing of the system in
accordance with National Fire Protection Association standards, Building Codes, and Owner’s and
Insurer’s test procedures.
NOTE:
This manual is not a replacement of the technical data sheets for assemblies and individual
components used in a Red-E DV-5A Cabinet. The technical data sheets contain important information
concerning safety, system operation, maintenance and equipment testing responsibilities.
Read and understand the Installation, Operation and Instruction Manual for the Potter PFC-4410RC
and the General Air Products, Inc. Oil-Less Compressor Instruction Sheets which were provided with
this unit. These documents include important safety warnings, installation instructions and testing and
maintenance procedures for those devices which are included in this unit
Summary of Contents for Deluge Red-E
Page 1: ...Installation Guide Doc DV5A RED E 001 REV2 06 2019...
Page 2: ......
Page 5: ......
Page 80: ...75 Double Interlock Electric Pneumatic Wiring Schematic Non Integrated Releasing Panel...
Page 81: ...76 Double Interlock Electric Electric Wiring Schematic Non Integrated Releasing Panel...
Page 82: ...77 END...