409-10042
DT-3000 Machines 1725100-[ ] and DT-5000 Machines 1725800-[ ]
Rev E
8 o f 22
Tyco Electronics Corporation
Figure 7
DC Motor
Back Cover
CPU/Motor Controller
(Behind Back Cover)
Motor Access
Cover
Reel Support Hole
Power Switch/Circuit Breaker
Terminal
Strip Guide
Hole for Customer Supplied
Lift Ring
3. RECEIVING INSPECTION AND INSTALLATION
3.1. Receiving Inspection
The machines are thoroughly inspected during and after assembly. A final series of inspections is made to
insure the proper machine functioning before packaging and shipping.
To protect against damage that may have occurred during shipment, remove the machine from the crate
(Paragraph 3.2) and carefully inspect the machine for damage. If damage is evident, file a claim against the
carrier and notify Tyco Electronics immediately.
3.2. Installation
Remove all mounting bolts securing the machine to the shipping pallet. Install lift ring (refer to Figure 7) on top
of the machine.
Lift ring (M1220 eye bolt) is customer supplied.
Install the lift ring carefully. A 19.05-mm [.75-in.] thread length engagement is required for the lift ring to support the
machine.
Attach a suitable hoist to the lift ring, lift the machine, and place it in the selected operating location.
NOTE
i
CAUTION
!