background image

 

Art.-Nr. 907.75.02.00 
Stand 07/2019 

- 14 - 

 

GB 

 

Connections 

 

HVL 

Heating flow 

HRL 

Heating return 

WW 

Hot water 

KW 

Cold water  

ZI 

Circulation 

 

Safety valve bypass line 

Persons must not be endangered by hot water and vapour escaping. Two or more safety 
valves' blow-off lines must be unrestricted; they must individually end at a drainage point. 
The outlet diameter of the blow-off lines must match the dimensions of the connected safety 
valve, include no more than two bends, and not exceed a maximum length of two metres. 
The entire blow-off line must be enlarged if it is necessary to install more bends or lines in 
excess of the maximum length. More than three bends and a length in excess of four metres 
are not permitted. 
The end of the blow-off line must be located 20-40 mm over a sanitary drainage object or 
drainage funnel and clearly visible. 
The end of the blow-off line must be protected from frost. 
 

5.4 

Electrical connections 

5.4.1 

General 

Only authorised, specialist personnel is permitted to open electrical housings and work on 
the electrical system after de-energising the equipment. When creating connections, make 
sure the terminal assignments and polarity are correct. Protect the control unit and electrical 
components against excess voltage. 

 

 

Danger! 

Risk of fatal electric shock as a result of incorrect electrical connections. 

  Electrical connections must exclusively be created by electricians ap-

proved by energy suppliers and as per the locally applicable regulations. 

  Disconnect the supply voltage prior to any work. 

 

5.4.2 

Control unit connections 

 

The control units on the fresh water stations are pre-wired. 
Connect the power supply, the circulation (pump and temperature sensor) and, if necessary, 
the return flow circuit.  
 
The individual cascade stations are connected to each other via the K-bus network. From the 
3

rd

 cascade we recommend merging the connection in a separate connection box.  

 
For this purpose, observe the separate operating instructions for the control unit. 
 

5.4.3 

Equipotential bonding 

 

The terminal point must be properly connected to the building potential equaliza-
tion on the mounting plate.   

 
 
 
 
 
 

Summary of Contents for tubra-FRISTA KL

Page 1: ...D tubra FRISTA KL Kaskade Frischwasserstation Montage und Bedienungsanleitung...

Page 2: ...10 5 1 Wandmontage ohne Montageschienen 10 5 2 Wandmontage mit Montageschienen 11 5 3 Hydraulischer Anschluss 13 5 4 Elektrischer Anschluss 14 5 5 Allgemein 14 5 6 Anschluss Regelung 14 5 7 Anschluss...

Page 3: ...cher im Durch flussprinzip Es darf nur Trinkwasser im Sinne der Trinkwasserverordnung erw rmt werden Die Kaskadenanlagen tubra FRISTA KL2 KL6 bestehen je aus einer Masterstation und einer bis f nf Sla...

Page 4: ...al optional optional optional optional 3 Au f b a u Pos Benennung Pos Benennung 1 Kugelhahn Heizungsvorlauf HVL 10 Regelung 2 Umw lzpumpe 11 Halterung f r Regelung 3 Sicherheitsventil 12 Plattenw rmet...

Page 5: ...te Trinkwasserseite Heizwasser nach VDI 2035 Trinkwasser nach TrinkwV Abmessungen Einzelstation H x T x B mm 865 x 280 x min 525 865 x 280 x min 525 865 x 280 x min 525 865 x 280 x min 525 865 x 280 x...

Page 6: ...2019 6 D 4 2 Abmessungen Platzbedarf Abmessungen und Mindestplatzbedarf f r Montage und Wartungsarbeiten Je nach bauseitiger Vorrohrung erh hten Platzbedarf beachten Anschlussverrohrung nach rechts An...

Page 7: ...ne Anforderung Ammoniak NH4 2 mg l Keine Anforderung Freies Chlorgas 0 5 mg l Sulfit 1 mg l 7 mg l Ammonium 2 mg l Schwefelwasserstoff H2S 0 05 mg l Keine Anforderung Freie aggressive Kohlens ure CO2...

Page 8: ...w rmetauscherhersteller der Einsatz von Enth rtungsanlagen ab einer Wasserh rte 8 5 dH empfohlen Wasserbehandlungsma nahmen zur Vermeidung von Steinbildung Enth rtung Frischwasserstation mit Vormischu...

Page 9: ...nnen wahlweise rechts oder links oder wechselseitig angeschlossen werden Eventuell erh hten Platzbedarf f r Montage und Wartungsarbeiten beachten FRISTA KL2 Anschl sse rechts FRISTA KL2 Anschl sse li...

Page 10: ...entsprechend Zeichnung an zeichnen und mit 10 mm bohren D bel setzen Die beiden oberen Schrauben eindrehen Schraubenkopf ca 3mm von der Wand ab stehen lassen Station mit den oberen Halte sen in die S...

Page 11: ...it 10 mm bohren Obere Schiene 4 Befestigungspunkte Untere Schiene 2 Befestigungspunkte D bel setzen Montageschienen festschrauben Station mit den oberen Halte sen an den vorbereiteten Gewindestiften e...

Page 12: ...schraubtiefe achten Verschraubungsset montieren Dichtungen einlegen berwurfmuttern festdrehen Achtung Beim Festdrehen gegenhalten Expertentipp F r einfachere Montage erst die Heizungssei tigen Rohrel...

Page 13: ...pieldarstellung mit optionalem Zubeh r Zirkulationseinheit R cklaufumschaltung durch 2x tubra ZV Weiteres erh ltliches Zubeh r Kaltwasseranschluss Set Verrohrungssatz Speicher Darstellung erhebt keine...

Page 14: ...rischen Anlage sowie das ffnen von Elektrogeh usen darf nur in spannungsfreiem Zustand und nur von autorisiertem Fachpersonal durchgef hrt werden Bei den Anschl ssen auf richtige Klemmenbelegung und P...

Page 15: ...itet wird Beide Zonenventile werden an denselben Klemmen parallel angeschlossen Der Stellmotor des tubra ZV1 so auf das Ventil montieren dass das Ventil stromlos ge schlossen ist Den Stellmotor des tu...

Page 16: ...wasserseite vollst ndig entl ften Hinweis Bei zu hohen Flie geschwindigkeiten im Bef llprozess k nnen Kavitationen entstehen wodurch der Str mungssensor besch digt wird 6 1 2 Heizungsseite Das Heizung...

Page 17: ...chwerkraftbremse SKB integriert 7 3 Temperaturf hler Str mungssensor Um eine m glichst schnelle und genaue Temperaturmessung zu gew hrleisten wird f r den Sekund rkreis ein Tauchf hler eingesetzt der...

Page 18: ...n dass diese keine Unver tr glichkeit gegen ber Edelstahl Kupfer oder Nickel aufweisen Nichtbeachtung kann zur Zerst rung des W rmetauschers f hren Grunds tzlich sind die Sicherheitsvorschriften und E...

Page 19: ...u m p e n i n f o r ma t i o n Logik PWM2 7 Pumpe aus 7 12 Min Leistung Betrieb 12 15 Min Leistung start up 15 95 proportionaler Leistungsbereich 95 Max Leistung Elektrischer Anschluss Pumpe L braun...

Page 20: ...H ndler Gebr Tuxhorn GmbH Co KG Senner Stra e 171 33659 Bielefeld Germany Tel 49 0 521 44 808 0 Fax 49 0 521 44 808 44 www tuxhorn de...

Page 21: ...GB tubra FRISTA KL cascade Fresh water station Assembly and operating guide...

Page 22: ...ted assembly without assembly rails 10 5 2 Wall mounted assembly with assembly rails 11 5 3 Hydraulic connection 13 5 4 Electrical connections 14 5 5 General 14 5 6 Control unit connections 14 5 7 Cir...

Page 23: ...hrough principle Only drinking water in accordance with the Drinking Water Ordinance must be heated tubra FRISTA KL2 KL6 cascade systems each consist of a master station and one to five slave stations...

Page 24: ...al Optional 3 L a yo u t Item Description Item Description 1 Ball valve for heating flow HF 10 Control unit 2 Circulation pump 11 Bracket for control unit 3 Safety valve 12 Plate heat exchanger 4 Ball...

Page 25: ...r according to TrinkwV Drinking Water Ordi nance Dimensions single station H x D x W mm 865 x 280 x min 525 865 x 280 x min 525 865 x 280 x min 525 865 x 280 x min 525 865 x 280 x min 525 Secondary pr...

Page 26: ...Dimensions required space Dimensions and minimum space required for assembly and maintenance work Please note the increased amount of required space depending on the on site piping Connecting piping...

Page 27: ...SO4 2 Ratio 1 0 No requirement Ammonia NH4 2 mg l No requirement Free chlorine gas 0 5 mg l Sulphite 1 mg l 7 mg l Ammonium 2 mg l Hydrogen sulphide H2S 0 05 mg l No requirement Free aggressive carbon...

Page 28: ...using water softeners if the water hardness level is 8 5 dH Water treatment measures to prevent scale formation water softening Fresh water station with premix function Fresh water station without pre...

Page 29: ...ed either on the right or left or on both sides Note the potentially in creased amount of required space for assembly and maintenance work FRISTA KL2 connections right FRISTA KL2 connections left FRIS...

Page 30: ...the drilling dimensions as per the draw ing and drill with 10 mm Insert the rawl plugs Tighten the two top screws Tighten to a clearance of 3 mm between the screw head and the wall Attach the station...

Page 31: ...as per the above drawing and drill with 10 mm Top rail 4 attachment points Bottom rail 2 attachment points Insert the rawl plugs Tighten the assembly rails Suspend the station on the prepared threaded...

Page 32: ...observe identical screw in depth Assemble the screw connection set Insert seals Tighten the union nuts Caution Counter during tightening Expert tip Install the piping elements on the heating side firs...

Page 33: ...ustration with optional accessories circulation unit return circuit with 2x tubra ZV additionally available accessories cold water connection set piping set for the storage tank This illustration does...

Page 34: ...cialist personnel is permitted to open electrical housings and work on the electrical system after de energising the equipment When creating connections make sure the terminal assignments and polarity...

Page 35: ...energised Both zone valves are connected to the same terminals parallel Install the tubra ZV1 servomotor to the valve so that the valve is closed when de energised Install the tubra ZV2 servomotor so...

Page 36: ...drinking water side Note Cavitation may develop as a result of excessive flow speeds this may damage the flow sen sor 6 1 2 Heating side Only fill the heating system including the primary side of the...

Page 37: ...ncorrect circulation in the primary circuit 7 3 Temperature sensor flow sensor An immersion sensor positioned directly in the medium of the secondary circuit is used to ensure fast temperature measure...

Page 38: ...g solution Make sure any chemicals used for cleaning are suitable for stainless steel copper or nickel Non compliance may result in permanent damage to the heat exchanger Always observe the cleaning a...

Page 39: ...B 1 0 P u m p i n f o r m a ti o n Logic PWM2 7 Pump off 7 12 Min output operation 12 15 Min output start up 15 95 Proportional output range 95 Max output Electrical pump connection L brown N blue PE...

Page 40: ...Reseller Gebr Tuxhorn GmbH Co KG Senner Stra e 171 33659 Bielefeld Germany Tel 49 0 521 44 808 0 Fax 49 0 521 44 808 44 www tuxhorn de...

Page 41: ...I tubra FRISTA KL impianto a cascata Modulo per la produzione istantanea di acqua calda sanitaria Istruzioni di assemblaggio e d uso...

Page 42: ...et di tubazione 9 5 Montaggio 10 5 1 Montaggio a parete senza guide di montaggio 10 5 2 Montaggio a parete con guide di montaggio 11 5 3 Attacco idraulico 13 5 4 Allacciamento elettrico 14 6 Messa in...

Page 43: ...io di accumulo e uno scambiatore interno di calore a piastre ad equicorrente Deve essere riscaldata solamente dell acqua a seconda del regolamento riguardante l acqua potabile Gli impianti a cascata t...

Page 44: ...zione Pos Denominazione 1 Rubinetto a sfera mandata di riscaldamento MANDRISC 10 Dispositivo di regolazione 2 Pompa di circolazione 11 Supporto per il dispositivo di regolazione 3 Valvola di sicurezza...

Page 45: ...di riscaldamento secondo la norma VDI 2035 Acqua potabile secondo TrinkwV Dimensioni modulo singolo A x P x L mm 865 x 280 x min 525 865 x 280 x min 525 865 x 280 x min 525 865 x 280 x min 525 865 x...

Page 46: ...imensioni Ingombro Dimensioni ed ingombro minimo per montaggio e lavori di manutenzione A seconda della tubazione presente nell edificio occorre badare ad un elevato fabbisogno di spazio Tubatura conn...

Page 47: ...SO4 2 Rapporto 1 0 Nessun requisito Ammoniaca NH4 2 mg l Nessun requisito Gas di cloro libero 0 5 mg l Solfito 1 mg l 7 mg l Ammonio 2 mg l Acido solfidrico H2S 0 05 mg l Nessun requisito Anidride car...

Page 48: ...partire da una durezza dell acqua superiore a 8 5 dH Misure di trattamento dell acqua per evitare la formazione di depositi addolcimento Modulo per la produzione istantanea di acqua calda sanitaria c...

Page 49: ...ssono essere collegati sia a destra sinistra oppure su entrambi i lati Badare al fabbisogno eventualmente aumentato per lavori di montaggio e di manutenzione FRISTA KL2 raccordi a destra FRISTA KL2 ra...

Page 50: ...dimensioni del foro in base al disegno e forare con 10 mm Applicare i tasselli Avvitare le due viti superiori Avvitare fino a che la testa della vite si trovi a ca 3 mm dalla parete Appendere la stazi...

Page 51: ...n alto e forare con 10 mm Guida superiore 4 punti di fissaggio Guida inferiore 2 punti di fissaggio Applicare i tasselli Avvitare le guide di montaggio Appendere la stazione attraverso i ganci di supp...

Page 52: ...tare il set di raccordi a vite Inserire le guarnizioni Stringere i dadi di accoppiamento Attenzione Per fissare gli attacchi trattenerli Suggerimento dell esperto Al fine di semplificare il montaggio...

Page 53: ...con accessori opzionali unit di circolazione commutazione in ritorno tramite 2 tubra ZV Ulteriori accessori disponibili set per attacco dell acqua fredda sistema di tubazioni per serbatoio d accumulo...

Page 54: ...lettrico 5 4 1 Generale I lavori sull impianto elettrico e l apertura delle custodie dei componenti elettrici possono essere effettuati solamente a corrente elettrica scollegata e solo da personale sp...

Page 55: ...mpone sia diretto nella zona inferiore del serbatoio d accumulo quando non vi nessuna corrente Entrambe le valvole di zona vanno collegate presso gli stessi terminali in parallelo Montare il servomoto...

Page 56: ...edura di riempimento possono formarsi cavitazioni che comportano il danneggiamento del sensore di flusso 6 1 2 lato riscaldamento Riempire l impianto di riscaldamento compreso il lato primario dell im...

Page 57: ...na valvola di non ritorno nel ritorno dell impianto 7 3 Sonda termica Sensore del flusso Per garantire una misurazione della temperatura pi veloce ed accurata possibile nel circuito secondario vi un s...

Page 58: ...i fini della pulitura va assicurato che esse siano compatibili con acciaio inox rame oppure nichel L inosservanza di tale indicazione pu comportare la rottura dello scambiatore di calore In linea di m...

Page 59: ...o n i ine r e n t i al l a p o mp a Logica PWM2 7 pompa spenta 7 12 potenza min funzionamento 12 15 potenza min avviamento 15 95 intervallo di prestazione proporzionale 95 potenza max Allacciamento el...

Page 60: ...Rivenditore Gebr Tuxhorn GmbH Co KG Senner Stra e 171 33659 Bielefeld Germania Tel 49 521 44 808 0 Fax 49 521 44 808 44 www tuxhorn de...

Reviews: