950.15.02.00
Dated 2021/09/10
- 14 -
GB
8
M a i n t e n a n c e / s e r v i c e
The manufacturer recommends maintenance in the form of a function and visual check by
authorised, specialist personnel. Depending on the water quality and the age of the system,
the maintenance interval should be between 1 and 3 years.
For this purpose, the settings must be checked in accordance with the commissioning
protocol.
In manual mode, the
tubra
®
-eTherm P
must be operated with different heating outputs and
the function checked.
Components
Check
Electrical heating
element
At maximum heat output, heating should take place without boiling
noises, otherwise clean the electric heating element and decalcify
if necessary.
Cleaning the throttle valve bore
Shut off both ball valves to clean the
throttle valve bore
Unscrew and remove the cap (A) on the side of the
supply line ball valve and clean the throttle valve
bore (B).
A
B
Summary of Contents for 951.15.00.00
Page 1: ...D tubra eTherm P Montage und Bedienungsanleitung...
Page 11: ...Art Nr 950 15 02 00 Stand 2021 09 10 11 D 5 4 2 Elektrischer Anschluss Kaskade...
Page 17: ...GB tubra eTherm P Assembly and operating instructions...
Page 27: ...950 15 02 00 Dated 2021 09 10 11 GB 5 4 2 Electrical connection cascade...
Page 33: ...I tubra eTherm P Istruzioni di assemblaggio e d uso...
Page 43: ...N art 950 15 02 00 Ultimo aggiornamento 2021 09 10 11 I 5 4 2 Collegamento elettrico cascata...