Initial commissioning
Please observe the corresponding instructions for the control unit.
Danger!
The system must be filled with water and ventilate before initial electrical
start-up.
Task
Procedure
OK
Preparation and
inspection
Visual inspection of the installation.
Are all of the sensors installed and connected at the
correct locations?
Are all outputs connected?
Switch on the control
unit
Supply power to the control unit
Set up the control
unit
Please observe the instructions for the control unit.
Select a target temperature
Select the maximum accumulator temperature
Start the initial start-up routine
___
_
___
__
7
O p e r a t i o n
7.1
Control unit
Observe the installation and operating instructions for the control unit used.
7.2
Gravity brake
A gravity brake is integrated above the pump in the return line to prevent incorrect circulation.
7.3
Settings
Adjust the target temperature and maximum accumulator temperature.
Observe the installation and operating instructions for the control unit used.
Summary of Contents for 951.15.00.00
Page 1: ...D tubra eTherm P Montage und Bedienungsanleitung...
Page 11: ...Art Nr 950 15 02 00 Stand 2021 09 10 11 D 5 4 2 Elektrischer Anschluss Kaskade...
Page 17: ...GB tubra eTherm P Assembly and operating instructions...
Page 27: ...950 15 02 00 Dated 2021 09 10 11 GB 5 4 2 Electrical connection cascade...
Page 33: ...I tubra eTherm P Istruzioni di assemblaggio e d uso...
Page 43: ...N art 950 15 02 00 Ultimo aggiornamento 2021 09 10 11 I 5 4 2 Collegamento elettrico cascata...