3
TP9KAC-TUX
Mar 2019
PREPARATION
The installation of this lift is relatively simple and can be accomplished by 2 men in a few hours. The
following tools and equipment are needed:
·
12 quarts of Non-Detergent / Non-Foaming Hydraulic Oil - SAE-10, AW 32 or equivalent
·
Chalk line and 12
’ Tape Measure
·
4ft. Level
·
Rotary Hammer Drill with 3/4
” Masonry Drill Bit. (Core Drill Rebar Cutter also recommended)
·
Hammer and Hex Key Wrench Set
·
Metric Sockets and Open Wrench set - 13mm-30mm
·
Medium Adjustable Wrench and Medium Pipe Wrench
·
Crow Bar for Shim Installation and Medium Flat Screwdriver
·
Locking, Needle Nose and Snap Ring Pliers
GENERAL INFORMATION
1.
Carefully remove the crating and packing materials.
CAUTION!
Be careful when cutting steel banding material as items may become loose and fall
causing personal harm or injury.
2.
Identify the components and check for damage or shortages.
Please contact your distributor immediately, if any damages or shortages are discovered.
Packing
:
·
The lift assembly is packaged into two columns as one piece, as shown in
(Fig.1)
.
·
Every column comes with its cylinder, carriage, cables & chains, lifting arms, lifting pads, column
upright extensions, height extensions, hoses and 2 pc overhead beam with the hardware box located
in one of the columns.
·
The electric-hydraulic motor pump is packaged separately and banded to top of lift.
Fig. 1