
Traverse Installation and Commissioning Guide, Section 3: Alarm, Timing, and Management Interface Specifications
Timing Interface Input and Output Wire-Wrap Posts
Page 3-8
Turin Networks
Release TR3.2.1
Timing
Interface Input
and Output
Wire-Wrap
Posts
The Traverse main backplane provides access to timing interface contacts via
0.200-inch (0.5 mm) spaced, 0.045-inch (1.1 mm) square wire-wrap posts. The
following graphic shows where these wire-wrap posts are located on the Traverse main
backplane.
Figure 3-5 Timing Interface Wire-Wrap Posts
The following graphic provides Traverse main backplane timing interface labeling and
wire-wrap post numbers.
Figure 3-6 Timing Interface Wire-Wrap Post Numbers and Labeling
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Timing Interface
Wire-Wrap
Posts
T1/E1
CC2M
A
IN
B
A
IN
B
A
OUT
B
A
OUT
B
-
+
-
+
-
+
-
+
-
+
-
+
-
+
-
+
-
+
7
8
1
2
1
2
3
4
3
4
5
6
5
6
9
10
9
10
7
8