
Chapter 4 Battery and Battery Return Supply
Connect Battery Supply Cables to the PDAP
Release TR3.2.1
Turin Networks
Page 10-23
Connect
Battery Supply
Cables to the
PDAP
Battery “A” and “B” supply cables (customer-supplied) are run from the central office
battery distribution fuse bay (BDFB), or other central office battery source, to the
PDAP. Complete battery and battery return distribution cabling before bringing central
office battery and battery return supply cables to the PDAP.
Follow these steps to connect battery supply cables to the PDAP.
WARNING!
Ensure battery supply cables are not connected to central
office battery source before beginning this procedure to avoid
personal injury.
Important:
Always wear a properly grounded Electrostatic Discharge
(ESD) wrist strap when making cable connections to the PDAP and
Traverse main backplane.