
Traverse Installation and Commissioning Guide, Section 9: Alarm, Timing, and Management Cabling Procedures
PDAP-15A Power, Fuse, and Visual Alarm Wire-Wrap Posts
Page 9-20
Turin Networks
Release TR3.2.1
PDAP-15A
Power, Fuse,
and Visual
Alarm
Wire-Wrap
Posts
Power and fuse alarm cabling is connected from the PDAP-15A to one of the
following:
•
CO alarm panel for visual reporting of power failure, visual or audible reporting of
fuse A or B failure.
•
Traverse backplane as environmental alarm input connections.
Visual alarm cabling is connected from the Traverse backplane to 0.045-inch (1.1 mm)
wire-wrap posts on the back of the PDAP-15A. The following graphic shows where
these wire-wrap posts are located.
Figure 9-14 PDAP-15A Power, Fuse, and Visual Alarm Wire-Wrap Posts
The following graphic provides PDAP-15A power, fuse, and visual alarm labeling and
wire-wrap post numbers.
Figure 9-15 PDAP-15A Alarm Wire-Wrap Post Numbers and Labeling
Power, Fuse, and
Visual Alarm
Wire-Wrap Posts