Chapter 1 Alarm Interface Cabling
Visual Alarm Output Connections at the Next Shelf
Release TR3.2.1
Turin Networks
Page 9-9
5
Bring the visual alarm wires through the top cable port on the left side of
the Traverse shelf.
6
Bring the visual alarm wires over to the visual alarm wire-wrap posts on
the Traverse main backplane.
Figure 9-3 Visual Alarm Wire-Wrap Posts
Figure 9-4 Traverse 600 Visual Alarm Wire-Wrap Posts
7
Cut the visual critical alarm wires to the correct length and strip back the
insulation by .025 inch (7 mm).
Table 9-2 Visual Alarm Output Connections at the Next Shelf (continued)
Step
Procedure