
Installing
10
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | [email protected] | www.turck.com
5
Installing
The device can be mounted on a DIN rail according to EN 60715 (TH35). Two backplane bus
connectors are required for mounting on a DIN rail.
2
1
Fig. 3: DIN rail mounting
Disconnect the cabinet guard from the power supply.
Push two backplane bus connectors into the guide of the DIN rail and connect them to-
gether.
Plug the cabinet guard and the current measurement module onto the backplane bus
connectors.