background image

 
 

Page 1 of 23  

 

Turbovex A/S 

Industrivej 45, DK – 9600 Aars 

Tel: +45 96 98 14 62 – Fax: +45 98 96 42 24 
e-mail: 

[email protected]

 – 

www.turbovex.dk

 

     
 

Installation, operation and 

maintenance guide 
for window models 

 

 

 

                                  

                                

Rev. 2014.06.25 

Summary of Contents for TX 350A

Page 1: ...1 of 23 Turbovex A S Industrivej 45 DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk Installation operation and maintenance guide for window models Rev 2014 0...

Page 2: ...0 0 INSTALLATION OF UNIT 6 3 1 0 EXTERNAL DIMENSIONS 6 3 2 0 WALL WINDOW INSTALLATION 7 4 0 0 PLACING THE UNIT 11 PLACING THE UNIT CONT 12 5 0 0 SERVICE 13 5 1 0 FILTER CHANGE 13 5 2 0 REMOVING FILTER...

Page 3: ...ins technical information and details of installation and maintenance of the unit 2 2 0 Areas of use Window models are designed for comfort ventilation for institutions canteens offices and conference...

Page 4: ...info turbovex dk www turbovex dk 2 5 0 Main components Figure 2 Main components 1 Intake Air 2 Exhaust Air 3 Extract Air 4 Supply Air 5 Counterflow heat exchanger 6 Supply Air Fan 7 Extract Air Fan 8...

Page 5: ...Page 5 of 23 Turbovex A S Industrivej 45 DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk Figure 3 Main components 1 2 7...

Page 6: ...urbovex dk 3 0 0 Installation of unit 3 1 0 External dimensions Intake zone Minimum required distance to walls floor and ceiling is 70 mm Dimensions mm TX350A A Height 1400 B Width 662 C Depth 334 D M...

Page 7: ...ail info turbovex dk www turbovex dk 3 2 0 Wall window installation Internal reinforcement is built into the sides within the marked areas Holes can be drilled in these areas as required for installat...

Page 8: ...Page 8 of 23 Turbovex A S Industrivej 45 DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk Plane cross section for window wall...

Page 9: ...Page 9 of 23 Turbovex A S Industrivej 45 DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk Vertical cross section upper part...

Page 10: ...Page 10 of 23 Turbovex A S Industrivej 45 DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk Vertical cross section lower part...

Page 11: ...0 Placing the unit The unit is usually placed in the wall by a window This position makes the most of the coanda effect which circulates fresh air well into the room This gives the air longer to mix w...

Page 12: ...45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk Placing the unit cont Place the unit with the edge of the cabinet flush with the inside of the wall in the room Ensure free ai...

Page 13: ...96 42 24 e mail info turbovex dk www turbovex dk 5 0 0 Service 5 1 0 Filter change We recommend changing the filters and carefully cleaning the exchanger 2 4 times a year Upper keyhole Lower keyhole...

Page 14: ...Page 14 of 23 Turbovex A S Industrivej 45 DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk 5 2 0 Removing filters and exchanger...

Page 15: ...of 23 Turbovex A S Industrivej 45 DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk Change upper filter with inner door open Change lower filter with inner doo...

Page 16: ...DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk Remove inner door and filters to be able to lift out the heat exchanger Clean heat exchanger carefully using...

Page 17: ...o turbovex dk www turbovex dk 6 0 0 Connecting mains electricity 6 1 0 Connection Cable grommet holes Terminal clamps for connecting mains electricity Note Connection of mains electricity must be perf...

Page 18: ...ge 18 of 23 Turbovex A S Industrivej 45 DK 9600 Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk 6 2 0 Wiring diagram Connect Turbovex unit according to wiring diagra...

Page 19: ...urban traffic approx 90 dB A Temperature efficiency degree at the heat exchanger is stated in and is the relationship between the temperature differences achieved and the maximum achievable temperatur...

Page 20: ...Aars Tel 45 96 98 14 62 Fax 45 98 96 42 24 e mail info turbovex dk www turbovex dk 7 1 0 Sound test Sound test performed in our laboratory on 12 10 11 Principle Sketch Result 30 dB 290m h consumption...

Page 21: ...through the fan blade out through the louvres in the top and in to the room The extract air fan 4 draws air from the room through the louvres in the bottom and sides up through the filter 5 through t...

Page 22: ...d is set on the control panel We recommend that the temperature should not be set higher than the room temperature Fresh air temperature should be 2 3 degrees below room temperature to achieve the bes...

Page 23: ...fety of Machines Basic concepts general principles for design Part 1 Basic terminology and methodology ISO 12100 1 2003 DS EN 12100 2 A1 2009 Safety of Machines Basic concepts general principles for d...

Reviews: