4.5. Commissioning
Once you are finished with all connections, the machine is ready to commission.
It will proceed as follows:
1.
Reset the DC and AC protections at the back of the cabinet.
2.
Start the Batteries. To do this, press the Power button (On/Off) for 2-4
seconds. The BMS will start, and both the LCD screen and the power
button will light up.
3.
Connect the loads as specified in the previous scheme, and ready for
service.