background image

43 1/4"

42 1/2"

L 42 1/2"  W 43 1/4"  H 90 1/2"

Revision Date 06-26-02 

SP-407 
 
Single Column

 

SP-407  Rev0 

A S S E M B L Y   I N S T R U C T I O N S  

TABLE OF CONTENTS: 

 

Introduction 
    Pg. 1 
 
Safety Precautions 
    Pg. 1 
 
Assembly 
    Pg. 2 - Pg. 9 
 
Cable Adjustment 
    Pg. 7 
 
Cable Mapping Diagram 
    Fold-out Pg. 10 
 
Exploded View Diagram 
    Fold-out Pg. 11 
 
Parts List 
    Pg. 12 
 
Warranty 
    Back Page 

 

© 2003 TuffStuff Fitness Equipment, Inc.

A m e r i c a ’ s   P r e m i e r   E x e r c i s e   E q u i p m e n t

Summary of Contents for SP-407

Page 1: ...C T I O N S TABLE OF CONTENTS Introduction Pg 1 Safety Precautions Pg 1 Assembly Pg 2 Pg 9 Cable Adjustment Pg 7 Cable Mapping Diagram Fold out Pg 10 Exploded View Diagram Fold out Pg 11 Parts List P...

Page 2: ...lem regarding the proper assembly of this unit 2 Neatly organize and identify all parts according to the Parts List and the Exploded View Diagram Tool Requirements 1 One 3 4 combination wrench 2 One 9...

Page 3: ...tack Frame 1 using two Fin ished Hex Nuts 1 2 13 61 and two Flat Washers SAE 1 2 60 Note The black boxed letter pointing to the pulleys are used throughout this manual as reference to the Cable Mappin...

Page 4: ...right Connector 27 using four Cable Retainer Brackets 31 two Hex Head Cap Screws 3 8 16 X 4 1 2 50 four Flat Washers SAE 3 8 53 and two Nylon Insert Jam Lock Nuts 3 8 16 51 FIG 6 Maneuver the two Guid...

Page 5: ...he Selectorized Upright 23 using two Cable Retainer Brack ets 31 two Hex Head Cap Screws 3 8 16 X 3 3 4 49 four Flat Washers SAE 3 8 53 and two Nylon Insert Lock Nuts 3 8 16 52 Note Refer to the Explo...

Page 6: ...efer to the Cable Mapping Diagram on page 10 for fur ther illustration of this routing FIG 16 Next route the Cable 29 down and under the Nylon Pulley 4 1 2 Rd 14 Labeled F then up and over the Nylon P...

Page 7: ...er to the Cable Mapping Diagram on page 10 for fur ther illustration of this routing FIG 19 Continue Routing the Cable 29 up and over the Nylon Pulley 3 1 2 Rd 15 Labeled L Next attach a Nylon Ball 1...

Page 8: ...njury It is imperative that you maintain proper cable adjustment to ensure a safe and smooth operation Cable Adjustment 1 Loosen the bottom Finished Hex Nut 1 2 13 61 2 Adjust the top Finished Hex Nut...

Page 9: ...ater in the assembly process FIG 22 Connect the two Plastic Shroud Edge Protectors 9 to the Plastic Shroud Gap Cover 7 using the two Plastic Connectors 10 FIG 23 Attach the Plastic Shroud Gap Cover 7...

Page 10: ...ck Nuts 3 8 16 52 FIG 26 Secure the Plastic Shroud Lid 8 to Guide Rod Retainer 4 using two Flat Head Socket Cap Screws 3 8 16 X 3 19 9 SP 407 Single Column 21 2 4 2 2 8 32 27 FIG 25 Affix the Weight S...

Page 11: ...NH0401 2 62 NYLON INSERT LOCK NUT B O 5 16 18 BNH0215 2 21 BASE FRAME UP0992 1 63 NYLON BALL 1 3 4 X 1 4 BNH0047 2 22 STABILIZER UP0993 1 64 SHOULDER BOLT ALLOY 3 8 X 3 4 BNH0718 2 23 HIGH LOW SELECTO...

Page 12: ...sts on returned or replaced equipment to and from TuffStuff s facility in Pomona THE FORGOING SHALL CONSTITUTE THE SOLE REMEDY OF THE PURCHASER AND THE SOLE LIABILITY OF TUFFSTUFF WITH REGARD TO WARRA...

Reviews: