TUFFA TANKS 1250PT Installation, Operation And Servicing Manual Download Page 1

TUFFA

PETROL

TANKS

Installation, Operation and Servicing Manual Version 1.0.0

Models: 

975PT | 1250PT | 1950PT | 2500PT | 3000PT

Summary of Contents for 1250PT

Page 1: ...TUFFA PETROL TANKS Installation Operation and Servicing Manual Version 1 0 0 Models 975PT 1250PT 1950PT 2500PT 3000PT...

Page 2: ......

Page 3: ...6 Electrical requirements 15 6 7 Electrical wiring diagram 15 7 Operation of the system 16 7 1 Using the system 16 7 2 Summary of main parts 16 7 3 Filling TUFFA petrol tank 18 7 4 Dispensing petrol...

Page 4: ...ange the specifications of its products or the information in this manual without necessarily notifying its users Variations in installation and operating conditions may affect the Tuffa Tank systems...

Page 5: ...nd exercise all due care 2 Installation and use of this product should only be carried out by properly trained and approved personnel 3 Please refer to storage media MSDS which should be supplied by t...

Page 6: ...Second Edition Tuffa petrol dispensing tanks are offered in a variety of pumping specifications in order to meet end user requirements dispensing options vary between a manual hand pump 12V 240V pumps...

Page 7: ...Weight approx 585kgs 795kgs 940kgs 1160kgs 1275kgs Bund material Mild steel construction Inner tank material Mild steel construction Description Bunded petrol tank Fill point 4 BSP Voltage 12V 240V Ve...

Page 8: ...6 4 3 Product Footprint 4 PRODUCT DESCRIPTION...

Page 9: ...7 4 PRODUCT DESCRIPTION...

Page 10: ...8 4 PRODUCT DESCRIPTION...

Page 11: ...9 4 PRODUCT DESCRIPTION...

Page 12: ...10 4 PRODUCT DESCRIPTION...

Page 13: ...ent either a forklift with extended forks tines or a crane If lifting slings are used they must be attached to the lifting points as shown in the pictures below using a steel lifting eye insert If lif...

Page 14: ...ete base built in accordance with good building standards and engineering principles It is recommended that tanks be installed on a concrete base at least 100mm thick Please refer to diagram below 6 3...

Page 15: ...hese between tank separation distances will prevent damage or even destruction of the adjacent tanks However they should allow enough time for emergency procedures to be implemented and for people to...

Page 16: ...efore any petrol tank installation to identify the hazards that the product and environment can pose A risk assessment should at best identify the hazards and quantify the risks associated with the fo...

Page 17: ...help to implement the appropriate control measures required to remove or reduce that risk or hazard 6 6 Electrical requirements Only a suitably qualified electrician according to applicable regulation...

Page 18: ...garded as mis use of the system the user of the system will be liable for any defects that occur due to its unintended use 7 1 Using the system The operation and maintenance personnel must be suitably...

Page 19: ...17 Hand pump 240v pump 7 OPERATION OF THE SYSTEM...

Page 20: ...containing any drips 12V pump 1 Ensure 12v battery is a minimum of 4 metres away from tank so that crocodile clip cables are fully extended 2 Connect clips to battery red positive and black negative 3...

Page 21: ...s full the nozzle will automatically switch off 7 Release the trigger of the nozzle and replace back into the holster containing any drips 8 Turn off pump motor remove cable clips and stow away neatly...

Page 22: ...e parts which are used must comply with the technical requirements which are defined in this manual or directly by the manufacturer ATTENTION Please make sure prior to any maintenance work that power...

Page 23: ...s and leaks Any outlet valves should be checked for leaks and operation open and close successfully The testing of contents gauge any high level overfill alarm and bund alarm If vents can be seen that...

Page 24: ...rate 1 Blockage in the strainer 1 Clean strainer 2 Low battery 12v versions only 2 Charge replace battery Auto nozzle not operating 1 Spring mechanism inside nozzle valve failed 1 Replace nozzle 2 Tr...

Page 25: ...correct 2 Refer to flowmeter instructions in operation section 3 Display failure 3 Replace pulse meter display or flowmeter Inner tank has lifted up and ruptured bund lid 1 Petrol inside bund causing...

Page 26: ...24 8 5 Tank maintenance record Date Description of works Comments Site representative contractor details 8 MAINTENANCE OF THE TUFFA TANKS...

Page 27: ...25 8 5 Tank maintenance record Date Description of works Comments Site representative contractor details 8 MAINTENANCE OF THE TUFFA TANKS...

Page 28: ...26 8 6 Petrol delivery log Date Time Amount delivered litres Tanker driver signature Drivers comments 8 MAINTENANCE OF THE TUFFA TANKS...

Page 29: ...27 8 6 Petrol delivery log Date Time Amount delivered litres Tanker driver signature Drivers comments 8 MAINTENANCE OF THE TUFFA TANKS...

Page 30: ...any defect you must contact the seller or distributor and allow a representative to inspect the tank and its surroundings and where necessary carry out any repairs This guarantee is not valid for the...

Page 31: ...rantee registration To register your tank warranty please visit the link to our website as below The guarantee card must be completed online within 21 days of the date of the tank delivery to the firs...

Page 32: ......

Reviews: