8-1
Section 8 - Optional Flow Control -
Nitro
Section 8 - Optional Flow Control
Flow Control Installation
To install a flow control option follow these
instructions:
NOTICE:
Some older machines may require
mounting holes to be drilled out. Place flow
control in desired location on right side of hose
hanger and center punch holes before drilling.
•
Slide the 2 provided 1/4-20 x 3 hex bolts
(A)
through 1/4” washers and holes in flow
control body
(B)
.
•
Place the 2 provided 1/2” hex nuts
(C)
over
the bolt ends to act as spacers between
the flow control and hose hanger.
NOTICE:
Disregarding the spacer nuts may
cause interference between the flow control
assembly and the PTO holder
(D)
.
•
Secure flow control with provided 1/4” flat
washers and lock nuts
(E)
.
•
Remove 2 existing 30661 hoses
(F)
from
upper right and middle right bulkhead
fittings
(G)
on front of hose hanger.
•
Connect 2 existing 30661 hoses to “EX”
and “IN” port fittings of flow control.
•
Connect 2 provided 37987 hoses
(H)
to flow control “CF” port fitting and bi-
directional flow control hydraulic fitting
(I)
.
NOTICE:
The electric flow control option
requires an electric controller
(J)
installed in
power unit cab. Harness must be routed and
connected into flow control solenoid plug
(K)
.
Not applicable for manure spreaders with
scale systems.
A
C
E
B
D
F
G
I
H
K
J
Summary of Contents for NITRO 275RS
Page 35: ...7 4 Section 7 Service Maintenance Nitro Grease Points ...
Page 36: ...Nitro Section 7 Service Maintenance 7 5 ...
Page 37: ...7 6 Section 7 Service Maintenance Nitro Optional Grease Line Ports ...
Page 38: ...Nitro Section 7 Service Maintenance 7 7 ...
Page 39: ...7 8 Section 7 Service Maintenance Nitro Optional Two Stage Beater Lubrication Points ...
Page 40: ...Nitro Section 7 Service Maintenance 7 9 Optional Two Stage Beater Lubrication Points 750 950 ...
Page 45: ...V Torque Values Imperial Nitro Torque Values Imperial ...
Page 46: ...Nitro Torque Values Metric VI Torque Values Metric ...
Page 49: ......