background image

             

L

ITERATURE

P

ART

#5.95.0000.000

*

Revision date: April 20h06 

 

*

*

include with all SuperTitan Towers

--

I

NSTALLATION

M

ANUAL

November 2011

August 2014

Summary of Contents for SuperTitan

Page 1: ...LITERATURE PART 5 95 0000 000 Revision date April 20h06 include with all SuperTitan Towers INSTALLATION MANUAL November 2011 August 2014...

Page 2: ...nd strength in transport and will protect against the potential for a loss of section parts hardware During testing the new self contained packaging vastly outperformed the existing wood crate This im...

Page 3: ...tan Unpacking Manual Step 1 Place SuperTitan section on flat sturdy surface Check section for any signs of damage Step 2 Disassemble the bolt connection that is connecting the end cap to the top secti...

Page 4: ...Step 3 Remove Leg exposing the section s hardware on the inside Step 4 Carefully remove the section s hardware taking care to ensure all parts are accounted for...

Page 5: ...Step 5 Disassemble the remaining bolt connections and separate the section legs from the end cap Step 6 Review SuperTitan Installation Manual Part Number 5 95 0000 000...

Page 6: ...Step 7 Recycle End Cap and Bolt Assemblies...

Page 7: ...onal hole on both sides of the angle at the bottom of the leg This additional hole has been added to facilitate Trylon s NEW SuperTitan Packaging method The addition of these two holes does not in any...

Page 8: ...et 2 Section Assembly Drawings Section 1 21 3 25 Top Section Angle Frames Top Mount Pipe Kits 26 27 Short Foundation Sections 1 12HD 28 41 Base Feet Template Sections 1 12HD 42 Base Feet Template Draw...

Page 9: ...Pg 1...

Page 10: ......

Page 11: ...Instructions for Tightening of SuperTITAN A325 Grade Bolts Using Turn of the Nut Method...

Page 12: ...Pg 3...

Page 13: ...Pg 4...

Page 14: ...Pg 5...

Page 15: ...Pg 6...

Page 16: ...Pg 7...

Page 17: ...Pg 8...

Page 18: ...Pg 9...

Page 19: ...Pg 10...

Page 20: ...Pg 11...

Page 21: ...Pg 12...

Page 22: ...ENG SERVER ammeridian VAULT D DRAWINGS 000001 620 0128 1 dwg 5 25 2007 10 36 03 AM marcush...

Page 23: ...Pg 13...

Page 24: ...Pg 14...

Page 25: ...Pg 15...

Page 26: ...Pg 16...

Page 27: ...Pg 17...

Page 28: ...Pg 18...

Page 29: ...Pg 19...

Page 30: ...Pg 20...

Page 31: ...Pg 21...

Page 32: ...Pg 22...

Page 33: ...Pg 23...

Page 34: ...Pg 24...

Page 35: ...Pg 25...

Page 36: ...Pg 26...

Page 37: ...Pg 27...

Page 38: ...Pg 28...

Page 39: ...Pg 29...

Page 40: ...Pg 30...

Page 41: ...Pg 31...

Page 42: ...Pg 32...

Page 43: ...Pg 33...

Page 44: ...Pg 34...

Page 45: ...Pg 35...

Page 46: ...Pg 36...

Page 47: ...Pg 37...

Page 48: ...Pg 38...

Page 49: ...Pg 39...

Page 50: ...Pg 40...

Page 51: ...Pg 41...

Page 52: ...Pg 42...

Page 53: ...Pg 43...

Page 54: ...Pg 44...

Page 55: ...Pg 45...

Page 56: ...Pg 46...

Page 57: ...Pg 47...

Page 58: ...Pg 48...

Page 59: ...Pg 49...

Page 60: ...Pg 50...

Page 61: ...21 61 Revised April 2006 TABLE OF CONTENTS SUPERTITAN INSTALLATION MANUAL PDF SUPERTITAN Foundation Drawings for NORMAL DRY SOIL EIA Foundation Notes 51 Regular Foundation NDS Section 2 12HD 52 Single...

Page 62: ...Pg 52 Pg 51...

Page 63: ...Pg 53 Pg 52...

Page 64: ...Pg 51 Pg 53...

Page 65: ...Pg 54...

Page 66: ...Pg 55...

Page 67: ...Pg 56...

Page 68: ...Pg 57...

Page 69: ...Pg 58...

Page 70: ...Pg 59...

Page 71: ...Pg 60...

Page 72: ...Pg 61...

Page 73: ...Pg 62...

Page 74: ...Pg 63...

Page 75: ...Pg 64...

Page 76: ...Pg 66...

Page 77: ...Pg 67...

Page 78: ...Pg 68...

Page 79: ...Pg 69...

Page 80: ...Pg 70...

Page 81: ...Pg 71...

Page 82: ...Pg 72...

Page 83: ...Pg 73...

Page 84: ...Pg 74...

Page 85: ...Pg 75...

Page 86: ...Pg 76...

Page 87: ...Pg 77...

Page 88: ...Pg 78...

Page 89: ...Pg 79...

Page 90: ...Pg 80...

Page 91: ......

Page 92: ...ITAN INSTALLATION MANUAL April 2006 Printed in Canada Copyright Trylon Manufacturing Co 21 SOUTH FIELD DRIVE P O BOX 186 ELMIRA ON N3B 2Z6 CANADA TEL 519 669 5421 FAX 519 669 4187 WEBSITE www trylon c...

Reviews: