AV30 PRE-INSTALLATION REQUIREMENTS | AV30 Pre-Installati on Requirements | v. 3.0
33 / 37
4) All sensors (thermocouples and pressure transducers) are properly functioning.
At this point you are ready for a TruSteel technician to visit your facility to finalize the AV30,
train your operators, and perform an IQ/OQ (installation and operational qualification)
STAGE 9: TRUSTEEL TRAINING & IQ/OQ
TruSteel will come to your facility to complete the AV30 installation, perform an IQ/OQ,
and train your operators on how to use the AV30 for maximum performance.
In order to prepare for this training, please ensure that you will have at least 60 gallons
of tincture to run through the AV30. It is advised to have tincture that will be the same,
or similar, to the tincture that will be normally process so that proper parameters can be
set according to your material.
You should also have at least 5 gallons of distilled water and 5-10 gallons of clean
solvent available to run a cleaning cycle.
TruSteel Project Management will coordinate with you the date of the on-site training
and IQ/OQ.
Note that we require all stages throughout this installation manual to be complete
before arriving to your facility. We also require at least a 2 week advance to arrange
travel.
APPENDIX
REQUIRED COMMODITIES
The following is a list of commodities NOT supplied by TruSteel.
Please note that you should buy all this equipment NEW. Unsanitary equipment can
damage the AutoVap system.
Required Commodities
☐
A sump pump (minimum 25 ft head pressure) with a short piece of hose (with hose
fittings) and 25+ gallon reservoir/tote
…used to fill the water heater line.
Link to Purchase Sump Pump (Amazon)
Link to Purchase Sump Pump (Home Depot)
Link to Purchase Hose (Amazon)
☐
An air compressor dedicated to use with the AutoVap (used for discharge).
Link to Purchase Air Compressor (Home Depot)
☐
At least 100 gallons of DISTILLED WATER, NOT tap water, on site.