............ www.truemfg.com ............
INSTALLATION MANUAL FOR TCGG MODELS
(CURVED GLASS DELI CASE)
TCGG MODELS
(CURVED GLASS DELI CASE)
CONGRATULATIONS!
You have just purchased the finest commercial
refrigeration available. You can expect many years
of trouble-free operation.
TRUE FOOD SERVICE EQUIPMENT, INC.
2001 East Terra Lane • O’Fallon, Missouri 63366-4434
(636)-240-2400 • FAX (636)272-2408 • INT’L FAX (636)272-7546 • (800)325-6152
Parts Department (800)424-TRUE • Parts Department FAX# (636)272-9471
TABLE OF CONTENTS
Safety Information
Safety Precautions ––––––––––––––––––––––––– 1
Proper Disposal –––––––––––––––––––––––––––– 2
Connecting Electricity ––––––––––––––––––––––– 4
Adapter Plugs ––––––––––––––––––––––––––––– 4
Installation / Operation Instructions
Ownership ––––––––––––––––––––––––––––––– 4
Required Tools –––––––––––––––––––––––––––– 4
Uncrating –––––––––––––––––––––––––––––––– 4
Location –––––––––––––––––––––––––––––––––– 5
Leveling Cabinet ––––––––––––––––––––––––––– 5
Defrost Timer Instructions (Grasslin Timer) –––––––– 6
Conductors and Circuits ––––––––––––––––––––––– 7
Electrical Instructions & Start-up –––––––––––––––– 8
Sealing the Cabinet to the floor –––––––––––––––– 9
Shelving Installation & Operation ––––––––––––– 9-10
Maintenance, Care & Cleaning
Temperature Control Adjustment –––––––––––––– 11
Cleaning Condenser Coil –––––––––––––––––– 12-13
Stainless Steel Equipment Care & Cleaning ––––– 14-15
Light Bulb Replacement ––––––––––––––––––––– 15
Warranty (U.S.A. & CANADA ONLY!) –––––––––––––– 16
TCGG-48-S
TCGG-72-S
*Spanish, German, and French versions included.
#912627 • WP-99
Summary of Contents for TCGG-48-S
Page 2: ......