![Troxler EGauge 4590 Manual Of Operation And Instruction Download Page 51](http://html1.mh-extra.com/html/troxler/egauge-4590/egauge-4590_manual-of-operation-and-instruction_1172540051.webp)
Model 4590
4–5
T
T
a
a
k
k
i
i
n
n
g
g
t
t
h
h
e
e
S
S
t
t
a
a
n
n
d
d
a
a
r
r
d
d
C
C
o
o
u
u
n
n
t
t
NOTE:
Before you start any measurements, ensure that no
other gauges are nearby. 30 feet minimum distance is
required.
A daily standard count should be performed to adjust for source
decay, environmental conditions and to check for proper
functioning of the gauge. A four-minute standard count and a
background count help to ensure the highest measurement
accuracy.
The gauge should be turned on 10 minutes before the standard
count is performed to allow all systems to warm up and
stabilize. When practical, turn on the gauge before loading it in
the vehicle so it can warm up during transport to the jobsite and
be ready upon arrival.
Site Requirements
Troxler recommends that the standard count be performed at
the test site on the same soil where readings will be performed
in order to account for background influences.
The test site should meet the following criteria:
♦
A smooth, dry surface such that the EGauge does not rock.
♦
At least 3 meters (10 ft.) from any large vertical surface.
♦
At least 10 meters (33 ft.) from any other radioactive source
such as other nuclear gauges.
♦
On concrete or compacted soil at least 10 centimeters (4 in.)
thick and with a density of at least 1600 kg/m
3
(100 pcf).
The Model 4590 gauge is placed directly on the soil when
performing the standard count.
Summary of Contents for EGauge 4590
Page 9: ......
Page 18: ...xvi NOTES...
Page 24: ...1 6 Figure 1 4590 Gauge and Standard Accessories...
Page 26: ...1 8...
Page 70: ......
Page 94: ...6 4...
Page 104: ......
Page 164: ......
Page 168: ......
Page 171: ...Model 4590 F 3 Standard Count Log Gauge Serial Number Date DS BGD Date DS BGD...
Page 174: ......
Page 186: ...Notes NOTES...