![Troxler EGauge 4590 Manual Of Operation And Instruction Download Page 106](http://html1.mh-extra.com/html/troxler/egauge-4590/egauge-4590_manual-of-operation-and-instruction_1172540106.webp)
8–4
V
V
i
i
e
e
w
w
P
P
r
r
o
o
j
j
e
e
c
c
t
t
D
D
a
a
t
t
a
a
The gauge offers two methods of viewing data. You can either
view the last measurement results using the
Recall
function (see
page 4–20), or any measurement results, including project
notes, stored in a project file using the
View
function available
from the
Projects
menu.
To view data stored in a project file, press
〈
2
〉
from the
Projects
menu. The gauge displays:
Use the arrow keys to scroll through the project names. Press
〈
ENTER/START
〉
when the gauge displays the desired project
name. If any measurement data has been stored in the selected
project file, the gauge displays the data for the first
measurement.
Six screens of information are displayed for each measurement.
Use the up and down arrows to scroll through the project data.
Press the
〈
ESC
〉
key to return to the project selection screen
shown above.
Prj: XXXXXX
↨
04/08/14 04:08p
Rec: # UID: XXX
<ENTER> to Select
Summary of Contents for EGauge 4590
Page 9: ......
Page 18: ...xvi NOTES...
Page 24: ...1 6 Figure 1 4590 Gauge and Standard Accessories...
Page 26: ...1 8...
Page 70: ......
Page 94: ...6 4...
Page 104: ......
Page 164: ......
Page 168: ......
Page 171: ...Model 4590 F 3 Standard Count Log Gauge Serial Number Date DS BGD Date DS BGD...
Page 174: ......
Page 186: ...Notes NOTES...