Pre-Installation Instructions
8014 Trotec Speedy 500
Installation Preview
13/12/2011
Trotec Produktions- und Vertriebs GmbH
_Linzer Strasse 156, A-4600 Wels, Austria, Technical Support
15 / 15
tel_+43 (0)7242 239-7000, fax_+43 (0)7242 239-7380, mailto:
5 Installation Preview
The following list gives a preview of the installation procedure. This will assist you to prepare
yourself and your premises for the arrival of your new Speedy 500.
1.) Tools for initial installation
a. Power screw set of bits
b. Measuring tape
c. Double ended spanner
(Wheels: 22mm Feet: 24mm)
d. Water-level – min. 20cm
2.) Set-up
a. Fork lift (compare label [lift here])
b. Footprint
c. Unpack (take care on tables)
d. Retention time 24h at ambient temperature (unpacked)
e. Alignment with level (water level – min. 20cm)
3.) Connecting
a. Electricity
b. Gas
c. Cooling
d. Exhaust
4.) Initial operation
a. Activate peripherals (Electricity, gas, cooling, exhaust)
b. Unlock emergency switch
c. Main switch (striking sound)
d. Turn on key-switch
e. Machine starts - initializing
5.) Factory Setting check
a. Check optics (Lens, mirrors) to be clean
b. Check laser beam
c. Check
table
adjustment
d. Check air assist and gas
e. Check offset (0/0)
f. Check exhaust power
6.) Engraving sample / Cutting sample
a. Check correction factors, overtook, and tickles with any engraving job
b. Check laser correction with a cutting job
7.) End customer training according to user manual.