background image

Pre-Installation Instructions 
8014 Trotec Speedy 500 

Computer and Software Requirements 

13/12/2011 

Trotec Produktions- und Vertriebs GmbH

_Linzer Strasse 156, A-4600 Wels, Austria, Technical Support 

11 / 15 

 

tel_+43 (0)7242 239-7000, fax_+43 (0)7242 239-7380, mailto: 

[email protected]

 

2    Computer and Software Requirements 

Remember that the laser system is an output device just like a printer. With a higher specified 
computer you can create graphics and manipulate your software faster and process data faster to 
the laser, increasing your productivity. 
Also in order to install and configure software during installation, full administrative rights access is 
required. 
 

2.1   Minimum Computer Configuration for JobControl 

  Windows 7® 32/64-bit or 

Windows Vista® 32/64-bit (with Service Pack 1 or later) or  
Windows® XP 32/64-bit (with Service Pack 2 or later) 

  512 MB of RAM 

  400 MB of hard disk space 

  Pentium® 1 GHz processor or AMD Athlon™ XP 

  1024 x 768 or better monitor resolution 

  24-bit color depth graphics card 

  1 free USB interface 

 CD 

drive 

 Mouse 

 

2.2   Minimum Computer Configuration for TroCAM 

  Windows® XP Service Pack 3 or 

Windows 7® 32/64-bit 

  2 GB RAM for 32 bit / 6 GB RAM for 64 bit 

  120 GB hard disk space 

  Intel i5 / i7 Processor 

 DVD 

drive 

  Serial Port (preferred) or 

USB port for connection between PC and Laser 

 

2.3   Minimum Computer Configuration for I-Cut 

  Windows 7® 32/64-bit or 

Windows Vista® 32-bit (with Service Pack 1 or later) or  
Windows® XP 32-bit (with Service Pack 2 or later) 

  1 GB RAM 

  500 MB hard disk space 

  2 GHz Processor 

  PCI-Express-Slot X1 (22 + 14 Pins) 

  USB port for I-Cut Dongle 

  Serial port (preferred) or 

USB port for connection between PC and Laser 

Summary of Contents for Speedy 500

Page 1: ...Pre Installation Instructions 8014 Trotec Speedy 500...

Page 2: ...peedy 500 5 1 5 Operating Environment and Safety 6 1 6 Electrical Requirements 7 1 7 Electrical Connection 9 1 8 Gas Requirements for Gas Kit 10 2 Computer and Software Requirements 11 2 1 Minimum Com...

Page 3: ...o techsupport troteclaser com 1 Laser Machine Requirements 1 1 Transportation and Handling Dimensions of wooden crate W x D x H 2160 x 1810 x 1490 mm 85 5 x 71 5 x 59 inches Forklift requirement for u...

Page 4: ...chine ever needs to be relocated or shipped for any reason Perform the following steps to unpack the machine properly 1 Dismantle top and rear of the crate 2 Remove all tables and accessory found in t...

Page 5: ...aser com 1 4 Floor plan for the Speedy 500 It is necessary to have sufficient clear space to the sides front and rear of the machine for installation operation and maintenance Top View 1000mm 39 37 10...

Page 6: ...ature conditions Therefore once the system has been moved to the desired area it must be allowed to stand for 24 hours before use Rapid changes of temperature during operation can risk condensation fo...

Page 7: ...the desired frequency The following table provides information regarding power requirements which depends on the laser tube specification ac air cooled tube wc water cooled Laser Power Voltage Fuse Fr...

Page 8: ...th the following cable for mains supply connection depending on laser tube specification and region 60Wac 60Wwc 75Wac 85Wac 95Wac 105Wac 120Wac 120Wwc 200Wwc EU 86956 USA 5664 UK 16369 39886 Part Desc...

Page 9: ...l as voltage spikes can cause interference and possible damage to the electronics of the laser system It is better to connect the laser system to a dedicated electrical line It is highly recommended t...

Page 10: ...for Gas Kit An external gas or compressed air supply is required for machines with gas assist as well as for applications where the amount of air provided by the internal compressor is too small The f...

Page 11: ...ows 7 32 64 bit or Windows Vista 32 64 bit with Service Pack 1 or later or Windows XP 32 64 bit with Service Pack 2 or later 512 MB of RAM 400 MB of hard disk space Pentium 1 GHz processor or AMD Athl...

Page 12: ...nd the line thickness object dimension exceeds 0 2 mm items will be engraved if the smallest possible line thickness that your Desktop publishing program offers is chosen e g 0 001mm hairline in Corel...

Page 13: ...e exhaust system The laser power interacting with the work piece will be reduced by fumes and dust accumulating in the machine This will be avoided by a capable exhaust system Depending on the type of...

Page 14: ...230 1x230 1x230 1x115 1x115V 1x230 Frequency Hz 50 60 50 60 50 60 60 50 60 Phases L N Ground L N Ground L N Ground L N Ground L N Ground L N Ground Power consumption W 900 W 1800 W 3000 900 1800 3000...

Page 15: ...n 20cm 2 Set up a Fork lift compare label lift here b Footprint c Unpack take care on tables d Retention time 24h at ambient temperature unpacked e Alignment with level water level min 20cm 3 Connecti...

Reviews: