Triton Products LocBoard LB1-B Installation & Assembly Instructions Download Page 1

 

Installation & Assembly Instructions 

 

Please contact Customer Service with any questions at: 

30700 D Carter Street ∙ Solon, OH 44139 ∙ (P) 440.248.5480 ∙ 

[email protected]

                    

 

For a full line of products visit 

www.tritonproducts.com

 

 1

 

 

 

Read all instructions completely before installing.  Should you have any questions about your 

installation, please call Customer Service at 440-248-5480 

 

 

These rugged steel tool boards can be easily and quickly positioned to conform to your storage 
requirements. 

 

Boards can be positioned side by side or above one another in vertical and horizontal mounting 
positions. 

 

Additional boards and hooks can be added to your system as your needs continue to grow. 

 

LocBoards fasten directly to concrete, solid wood and hollow wall structures without the use of 
furring strips. (Mounting hardware not included.)   
 

LocBoard™ Installation:

 

Hardware needed for installation: (NOTE DO NOT USE Tapered Head Screws.) 

1

.   For hollow or concrete block wall: Quantity=12 Each #8- 

2” l

ong Phillips pan head machine screws 

and #8 plastic commercial grade wall anchors.  Head diameter s

ize of screws should not exceed .35” 

in order to fit through square holes in front of boards. 

2.

  For wood stud or wood headers:  Use #8-

2” long wood screws with Phillips pan h

eads. 

Tools needed for Installation:  

Level,  Marker,  7/32”

  standard  or  masonry  drill  bit,  7/64

”  std  b

it  for  wood  studs,  #2  Phillips  head 

screwdriver, power drill. 
 

1.

 

Select wall location for your LocBoards and the desired vertical or horizontal mounting pattern 
you wish to mount in. When selecting a location for mounting always make sure that mounting 
locations  do  not  fall  in  line  with,  are  adjacent  to,  or  interfere  with  any  internal  or  external 
electrical wiring, wall mounted or built-in electrical appliances, heaters,  gas lines,  ductwork or 
plumbing inside of wall, or are located on the opposite side of any wall surface from where you 
are  mounting.  If  you  are  unsure,  please  consult  a  professional  before  proceeding  with 
installation.

 

2.

 

(Using  Images  on  Back)

 

There  are  four  screw  holes  on  the  back  of  your  LocBoard  that  are 

accessible through the square holes on the front.   

  

3.

 

Place 1 LocBoard flat against wall surface. While using a level to make sure your board is straight 
and squared, looking through the square holes on the front of the board, mark the centers of all 
6  screw  holes  onto  your  wall  surface.    Note:    Installation  for  first  board  should  be  completed 
before marking mounting holes for the second board.   

4.

 

Pre-drill  holes  for  #8  wall  anchors  marked  in  Step  3  using  7/32"  standard  or  masonry  drill  bit 
depending on wall surface.  I

f you hit a wood stud stop drilling and using a 7/64” drill bit create a 

pilot  hole  for  the  wood  screw  Note:    Avoid  over  drilling  holes.  (Plastic  wall  anchors  should  fit 
snug.)   

5.

 

Insert plastic wall anchors in each hole drilled in Step 4 excep

t where you drilled 7/64” pilot hole 

for wood stud. 

6.

 

Align mounting holes in wall surface with screw holes in pegboard. Insert wood screws through 
the  front  square  opening  and  into  pre-installed  plastic  wall  anchors.    Tighten  all  screws.  The 
head of each screw should not be visible. 

7.

 

Repeat Steps 2-6 for second LocBoard installation. 

LB1-B, T, W - (2) 24

” 

x 24

” 

x 9/16

 LocBoard® Pegboards

 

Reviews: