
Installation_9
5. Determine space of module holder
Place gauge onto the carrier of the upper and lower module holders with the
corresponding module width plus the module width tolerance of 2 mm (va-
lue by experience).
Push the lower module holder so far that the gauge lies flush on both bra-
ckets without any clearance
With the bending tool, bend off 1x per edge flush on the lower module hol-
der and the bottom profile.
Note: If the substructure is assembled without pre-mounting, this bending
off can be done later in Chapter 2.2.2 with the inserted series connector.
Note: The bend must be torn out.
Summary of Contents for TRI-PLAT EAST-WEST
Page 2: ......