![TriContinent C24000 Product Manual Download Page 51](http://html.mh-extra.com/html/tricontinent/c24000/c24000_product-manual_1162143051.webp)
Valve movements
51
C-Series Product Manual
Figure 5-12. Positions for 3-port and 4-port T valves (U5 config)
T-port commands
using Z initialization
T-port commands
using Y initialization
I valve command sets input to the left
On 4-port valve, top port also connected
O valve command sets output to the right
On 4-port valve, top port also connected
B valve command connects Input,
output and syringe
O valve command sets output to the left
On 4-port valve, top port also connected
I valve command sets input to the right
On 4-port valve, top port also connected
B valve command connects input,
output and syringe
E valve command connects input to output
On 4-port valve, top port also connected
E valve command connects input to output
On 4-port valve, top port also connected
Syringe port located at bottom of valve
Jumper removed for 90° valve
4-port valve
top port
Summary of Contents for C24000
Page 8: ...This page intentionally blank ...
Page 14: ...This page intentionally blank ...
Page 142: ...This page intentionally blank ...