11
5
Installation
5.1
Installation planning
Important
Before the installation of the Tricel Vitae, it is important to read these instructions carefully.
•
When planning the installation of a Tricel Vitae, you must consider the following:
Backfill considerations:
o
Is this a dry or wet site, i.e. the presence of a water table?
o
Which backfill material is appropriate for this site?
o
What will the finished ground level be and will risers be required?
Site considerations:
o
Is the site restricted regarding area or height?
o
What is the topography of the site, i.e. being it sloping or flat?
o
What is the proposed depth of the installed tank to ensure the required slope
upstream?
o
Are static or rolling loads present on this site?
•
Only suitably qualified personnel should install the Tricel Vitae.
•
Suitably sized equipment will be required to excavate the hole and to lift the Tricel
Vitae into place.