background image

 
 

31605 21lts Chandelier Assembling Instruction

 

                                                                 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.  Unpack the carton and place the fixture on a flat surface. Attention: All necessary 

hardware and loose components have been verified for this fixture and are packed inside. 
Do not discard inner packing until you have inspected it thoroughly.     

2.  Thread the LOOP (A) onto the NIPPLE (J). Hang tightens until snug! 

3.

  Place GLASS (H) into the GLASS FRAME (I).

 

4.

  With the help of another person to hang the bottom hook of HANGER (G) to the GLASS 

FRAME (I) then hang onto the HOOK (B) of the fixture!

 

5.

 

Place the SIDE GLASS (E), GLASS HOLDER (D) through the socket onto the BOBECHE (F). Thread the 

SOCKET RING (C) onto the socket. Secure the glass by the SOCKET RING (E).   

 

6.

  Measure the height from hanging fixture to your ceiling. Cut the excess chain and wire to 

fit the height. Put the fixture onto the chain

 

7.

  Follow the wattage label on the fixture and install proper bulbs (no provided) onto the 

sockets.

 

8.

 

For mounting and wiring step please follow the mounting instruction sheet enclosed.

 

 

LOOP (A)

HOOK (B)

SOCKET RING (C)

GLASS HOLDER (D)

SIDE GLASS (E)

BOBECHE (F)

HANGER (G)

GLASS (H)

GLASS FRAME (I)

HANGER (J)

 

 

Reviews: