HARDW
ARE NEEDED
SLH-1- #14 x 2” Pan Phillips
T/S-
(3)
SLH-2- 1/4” USS Flatwasher
-
(3)
JPH-13- #14 x 2” Pan Phillips
T/S-
(8)
JPH-16- 1/4” USS Flatwasher
-
(8)
P
A
R
TS NEEDED
Slide-
(1)
1 1/4” Playgrip Safety Handles-
(4)
Main
Assembly
(All Main
Assembly Steps will be the same for the 5.4, 6.4, & 7.4)
Set slide up on deck, in between the corner post and the center post, and drill 5/16”
holes through the deck where the holes on the slide are.
Then secure slide.
SLH-1
SLH-2
JPH-13
JPH-16
Repeat this step for the Rockwall side of the Playcenter