MEGA 120D PUMP OPERATION / MAINTENANCE MANUAL
PAGE 3
1
INSTALLATION
1.1 UNPACKING
After unpacking, the pump should be checked for any damage that may have occurred
during shipment. Damage should be reported to the carrier immediately.
The following items should be included within the shipping container:
Qty
Item
Description
1
120D
Mega 120D Pump
1
M120D
Operation/Maintenance Manual
1.2 TIE BOLT TORQUE
The tie bolts on the pump are tightened before leaving the factory. However, relaxation
may occur due to handling, material creep, or other unforeseen events. Trebor
recommends that all eight tie bolts be re-tightened upon pump install. The following
procedure should be used:
1. Remove black tie bolt caps (Item 17 in Figure 4-1) from both sides of all 8 tie
bolts
2. Apply 80 in-lbs. (9.0 N-m) of torque to each slave side bolt while holding the
master side bolt stationary. A star-pattern is advised.
a. The master side is the left side of the pump if you are looking at the fluid
ports.
3. Replace the tie bolt caps.
1.3 UTILITIES / HOOK-UP
The pump is mounted using four 1/4” bolts. It is recommended that the pump be
mounted not more than 15
from level to maintain self-priming ability and pumping
efficiency.
Air Inlet:
1/2” FNPT (3/8” Dia. [8mm] supply tube minimum).
Air Supply:
25-80 psig (0.17-0.55 MPa) clean dry air or nitrogen. (For Air
Consumption, See Section 3.1 Performance Charts)
Fluid Ports:
Inlet/Outlet Fluid Fittings and Surge Suppressor require tightening to
specified torque values during pump installation. See Section 2 for
installation diagram and torque values.
Remote
Exhaust:
1/4
” FNPT (3/8” Dia. minimum tube up to 6’ length, 1/2” Dia. Minimum
tube greater than 6’ length).