
Optional Equipment (for qualified installers only)
41
© Travis Industries
4120309
100-01287_000
7. Carefully remove the control cover to access the stepper motor (see the illustrations below). The
stepper motor (adjustable regulator) has an installation sheet included with it – make sure to follow all
of the directions. Disconnect the wiring from the stepper motor. Remove the stock stepper motor
and replace with the LP version. –
MAKE SURE IT IS CORRECTLY ORIENTED
. Secure using the
screws included with the motor – tighten to 25 Lb-inches. Leak test this area after installation to
verify proper installation. Re-attach the wiring.
8. Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-
test all gas connections and the gas control valve.