Transport and installation
TNL20
DTE022DE - 24.06.2021
Installation of the machine
Removing the transport locks and drip pan from the machine
All transport locks and the drip pan must be removed before install-
ing chip conveyor or before commissioning the machine.
For the locations of the transport locks, see Chapter
“Preparing the
machine for transport”
.
Removing the transport lock, P/N 11096850
During removal, all screws of the transport lock must be removed.
After removing the transport locks and drip pan, they should be stored in a safe
place so that they can be reused (e.g., when transporting the machine again or
for decommissioning).
Indicator lamp
Connect the indicator lamp to the control cabinet if it has been removed during
transport.
Operating material
For operating material, see Chapter
“Operating material“.
Summary of Contents for TNL20
Page 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Page 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Page 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Page 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Page 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Page 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Page 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Page 73: ......