![Traub TNL20 Operating Instructions Manual Download Page 28](http://html1.mh-extra.com/html/traub/tnl20/tnl20_operating-instructions-manual_1153101028.webp)
28
Transport and installation
TNL20
DTE022DE - 02.08.2022
Preparing the machine for transport
Transport locks – operating panel
• Attach the bracket for axial transport securing of the control panel to the
existing threaded pins using suitable flange nuts.
Transport lock, P/N 12007235
• Secure the operating panel against rotation by locking the clamping lever.
Summary of Contents for TNL20
Page 6: ...Table of Contents 6 Transport and installation TNL20 DTE022EN 02 08 2022...
Page 10: ...10 Transport and installation TNL20 DTE022EN 14 03 2022 Safety...
Page 20: ...20 Transport and installation TNL20 DTE022EN 14 03 2022 General...
Page 66: ...66 Transport and installation TNL20 DTE022EN 14 03 2022 Electrical connection...
Page 68: ...68 Transport and installation TNL20 DTE022DE 24 06 2021 Operating material...
Page 70: ...70 Transport and installation TNL20 DTE022DE 24 06 2021 Pneumatic connection...
Page 72: ...72 Transport and installation TNL20 DTE022DE 24 06 2021 Switching on the machine...
Page 73: ......