![Transition Networks C4110-4848 Install Manual Download Page 5](http://html1.mh-extra.com/html/transition-networks/c4110-4848/c4110-4848_install-manual_1151563005.webp)
Transition Networks
S4110 Install Guide
33573 Rev. B
Page 5 of 20
Pre-
Installation
CAUTION
: Observe electrostatic discharge precautions when handling the S4110. Failure to observe this
caution could result in damage or failure of the S4110.
Safety
Before installing the S4110, read these “Safety Cautions” and ensure that the requirements noted are
met. During installation and maintenance, avoid direct exposure to laser beams. Specifically, do not look
into laser ports. Ensure that each SFP/SFP+ port at which laser beams are (or will be) present is
occupied by an SFP/SFP+ that is locked in position. See the related SFP/SFP+ manual for details.
See
"Electrical Safety Warnings"
on page
for Electrical Safety Warnings translated into multiple
languages.
Unpacking
1. Carefully unpack all S4110 contents.
2. Verify receipt of all S4110 components; see “
Ship Kit Contents
” below.
3.
Place the S4110 and related materials in the desired install location.
4. Save the S4110 shipping carton and packing materials for future use.
Ship Kit Contents
The S4110 is shipped with some standard and some optional components. Make sure you have received
the following standard items:
One S4110 device
One AC Power Cord/Adapter
One printed Product Documentation postcard
Four Rubber feet