TransCore AA3233 Installation Manual Download Page 7

 

3.  Check that the track bed is sufficiently level by laying a 20 in (50 cm) straight edge on the track 

bed perpendicular to the rails. This straight edge should align with the centerline of the two 

isolators (refer to 

Figure 1

 for location of isolator) located near the connector and the centerline of 

the end isolator. Measure the distance from the track bed to the bottom of the straight edge. The 

track bed should not dip more than 1.75 in (4.42 cm) below the straight edge at a distance of 5-in 

(12.7 cm) from the centerline of foot block #3. Additionally, the track bed surface should be smooth 

(within 0.5 in) over the lengths of the 15-in (38.1 cm) and 5 in (12.7 cm) segments (

Figure 3

).

Figure 2 Metal-free Zone Around Antenna

Installation Guide

7

Summary of Contents for AA3233

Page 1: ...Antenna These rugged 915 MHz antennas are specifically designed for the rail industry These antennas are designed for mounting between track rails This guide is intended for use by authorized TransCor...

Page 2: ...tered trademarks and are used under license All other trademarks are the property of their respective owners Contents are subject to change Printed in the U S A For further information contact TransCo...

Page 3: ...lled and used in accordance with the instruction manual Operating this equipment in a residential area is likely to cause harmful interference in which case depending on the regulations in effect the...

Page 4: ...n long 2 Required Tools and Supplies Use the following tools and supplies to install the antenna Safety goggles Power drill hammer drill recommended 3 8 in diameter x 3 in long masonry bit Soft jaw pl...

Page 5: ...bed Note To install the AA3233 Antenna correctly follow these procedures in the order in which they are presented The AA3233 002 has an integrated check tag Instructions that pertain only to the insta...

Page 6: ...nna 2 Ensure that area where the antenna will be mounted in the railroad trackbed is clear of any metal obstruction other than the rails as shown in Figure 2 Figure 1 Antenna Configuration Showing Cor...

Page 7: ...nnector and the centerline of the end isolator Measure the distance from the track bed to the bottom of the straight edge The track bed should not dip more than 1 75 in 4 42 cm below the straight edge...

Page 8: ...nge antenna location 6 When the track bed base is within the requirements of Step 3 stretch the template across any valley as shown in Figure 3 to get the proper center to center spacing between the f...

Page 9: ...re cover until the cable end extends approximately 1 ft 30 5 cm beyond the cover 6 Attach the antenna cable to the type N connector located on the antenna baseplate by first tightening the conduit loc...

Page 10: ...shoulder bottoms out against the baseplate and secure to torque of 20 in lb Fastening Antenna to Track Bed After you have secured the antenna connections as specified in Securing Antenna Hardware Con...

Page 11: ...uds apply liquid thread locker to threads and tighten nuts until they are seated 8 Secure the nuts to torque of 25 ft lb 9 Check that the antenna is anchored firmly to the concrete 10 If the 1 4 20 se...

Page 12: ...Table 2 lists the pin out signals and descriptions Table 2 Pin Out Signal Descriptions Pin Color reference only Pair Description A White blue stripe 1 Primary power B Blue white stripe 1 Ground C Bar...

Page 13: ...07 transcore com Trusted Transportation Solutions 1998 2020 TransCore L P All rights reserved TRANSCORE is a registered trademark and is used under license All other trademarks listed are the property...

Reviews: