![Trane Voyager Commercial Installation, Operation And Maintenance Manual Download Page 24](http://html1.mh-extra.com/html/trane/voyager-commercial/voyager-commercial_installation-operation-and-maintenance-manual_1149066024.webp)
24
RT-SVX34R-EN
Units with Statitrac
™
™
1. Open the filter access door, and locate the Statitrac
Transducer Assembly illustrated in
There are two tube connectors mounted on the left
of the solenoid and transducers. Connect one end
of the field provided 1/4” (length 50-100 ft.) or 3/8”
(length greater than 100 ft.) O.D. pneumatic tubing
for the space pressurization control to the fitting
indicated in the illustration.
2. Route the opposite end of the tubing to a suitable
location inside the building. This location should be
the largest open area that will not be affected by
sudden static pressure changes.
Figure 17.
Pressure tubing
Atmospheric Pressure Sensing Kit
Top Port Connection
2’ X 3/16” OD
tubing factory
provided pneumatic
tubing field installed)
Tubing connector
(in vertical support)
Outside air
pressure sensor
Sensor mounting
bracket
Factory provided
bracket
Duct Pressure Transducer
Tubing Schematic
Duct static
transducer
Sensing tube
to outside air
reference
Sensing tube to
discharge static pressure
sensing location
Duct Pressure Control
Component Layout
Supply air
duct static
transducer
Atmospheric reference
tubing connects
here
Summary of Contents for Voyager Commercial
Page 153: ...RT SVX34R EN 153 N No ot te es s...
Page 154: ...154 RT SVX34R EN N No ot te es s...
Page 155: ...RT SVX34R EN 155 N No ot te es s...