UNT-SVX07A-EN
11
Installation
dimensions
& weights
Vertical Cabinet Unit Dimensions, in-lbs.
unit
size
02-03
04
06
08
10-12
A
2’-9
5
/
16
”
3’-2
5
/
16
” 3’-11
3
/
16
” 4’-8
5
/
16
”
6’-3
5
/
16
”
B
1’-9
5
/
16
”
2’-2
5
/
16
” 2’-11
3
/
16
” 3’-8
5
/
16
”
5’-3
5
/
16
”
C
7
5
/
8
”
7
1
/
8
”
8
7
/
8
”
7
1
/
8
”
7
5
/
8
”
D
1’-6”
2’-0”
2’-6”
3’-6”
5’-0”
E
1’-7
5
/
16
”
2’-0
5
/
16
”
2’-9
13
/
16
” 3’-6
5
/
16
”
5’-1
5
/
16
”
F
3’-5
5
/
16
”
3’-10
5
/
16
” 4’-7
3
/
16
”
5’-4
5
/
16
” 6’-11
5
/
16
”
operating weight
97
125
155
164
218
shipping weight
84
112
139
148
200
Notes:
1. Coil connections are always on the drain pan side and opposite the control box.
2. Coil connections are
5
/
8
” O.D. sweat. See pages 21-22 for locations.
3. All duct collar dimensions are to the outside of the collar.
4. See pages 23-24 for fresh air opening dimensions.
Vertical Cabinet, Model B
Summary of Contents for UniTrane FC
Page 71: ...UNT SVX07A EN 71 typical wiring diagram Maintenance CSTI Fan Speed Switch...
Page 72: ...72 UNT SVX07A EN typical wiring diagram Maintenance CSTI Non Fan Speed Switch...
Page 73: ...UNT SVX07A EN 73 typical wiring diagram Maintenance Line voltage fan speed switch...
Page 74: ...74 UNT SVX07A EN typical wiring diagram Maintenance Tracer ZN010 with electric heat...
Page 76: ...76 UNT SVX07A EN typical wiring diagram Maintenance ZN520 with 2 stage electric heat...
Page 77: ......
Page 78: ......
Page 79: ......