background image

3

TTK-SVN001-EN

Contents

General Information

2

Pre-Installation Check

4

Item Required for Installation

Location and Preparation of Units &

5

Unit Installation

Selecting the Mounting Locations
Condensing Units Installation

Connection of Refrigerant Tubing

6

Connection the Unit with Flaring Procedure

Evacuation and Refrigerant Charge

8

Air Evacuation and Charging

Additional Charge

Gas Leakage Inspection

Electrical Installation

10

Condensing Unit Wiring

Finishing & Run Tests

11

Finishing

Run Tests

Typical Wiring Diagram

12

Dimensional Data

17

Notes

22

Layout

14/1/03, 10:16 AM

3

Black

Summary of Contents for TTK 042 K4

Page 1: ...g Only TTK 509 PB TTK 512 PB TTK 512 LB TTK 518 PB TTK 518 LB TTK 524 PB TTK 524 LB TTK 530 PB TTK 530 KB TTK 536 KB TTK 536 KD TTK 042 KD TTK 048 KD TTK 060 KD 60Hz Models Cooling Only TTK 512 P1 TTK...

Page 2: ...elivery If any concealed damage is discovered send a registered letter of protest to the carrier within 7 days of delivery and notify the dealer Warranty Warranty is based on the general terms and con...

Page 3: ...ondensing Units Installation Connection of Refrigerant Tubing 6 Connection the Unit with Flaring Procedure Evacuation and Refrigerant Charge 8 Air Evacuation and Charging Additional Charge Gas Leakage...

Page 4: ...en vibration between units Wall thickness of copper tube should be 0 8 mm 0 0314 in Table 1 Items Required for Installation Item Use or specification Deoxidizied annealed Interconnection between the i...

Page 5: ...ng pads 4 places into the bottom channels by tapping gently with a plastic or rubber tipped hammer optional Note This step applies only to models with such installation items supplied 2 Set the unit o...

Page 6: ...ed length with a tube cutter It is recommended to cut approx 30 cm 50 cm 12 to 20 longer than the tubing length you estimate 2 Hold each tube downward when cutting remove burrs at the end of the coppe...

Page 7: ...together This is effective for reducing gas leaks Figure 5 Connection 9 For proper connection align the union tube and flare tube straight with each other then screw in the flare nut lightly at first...

Page 8: ...auge to suction and liquid line valves service ports Attached center hose of manifold gauges to vacuum pump Note Unnecessary switching of hoses and complete evacuation of all lines leading to sealed s...

Page 9: ...e after the completion of evacuation step 5 The refrigerant provided by the manufacturer meets all the requirements of our units When using recycled or reprocessed refrigerant it is advisable to ensur...

Page 10: ...blem 9 Replace the outdoor unit terminal cover Condensing Unit Wiring Warning Do not allow the electrical wires inside the compressor compartment to come in contact with refrigerant pipes compressor o...

Page 11: ...y or death Do not stand on the unit 1 Check that field connections are correctly made 2 Check that units are correctly installed and there is no tool or debris near or on top of the unit 3 Check the t...

Page 12: ...BL BLUE NOTE 3 LOCAL CODES NOTES GN YL 220 240V 1PH 50Hz FROM INDOOR UNIT MS 2 BLK BLK 200 240V 1PH 60Hz 220 240V 1PH 50Hz 200 240V 1PH 60Hz CF C1 1 CR MS CPR R S S BL WH BR C FAN MTR C MS 1 R RD L L...

Page 13: ...MOTOR WH BR RD BLK BL BLK RD CF CR R S C M M COMPRESSOR GN YL GN YL X1 Terminal Strip L LINE From indoor control unit N Neutral Ground CD Fan Capacitor CR Compressor Run Capacitor Notes 1 Power wiring...

Page 14: ...FAN MTR FAN MOTOR MS COMPRESSOR MOTOR CONTACTOR TERMINAL JUNCTION IDENTIFIED TERMINAL COIL TERMINAL BOARD BY OTHERS TERMINAL BOARD BY FACTORY FIELD WIRING FACTORY WIRING RELAY CONTACT N O CAPACITOR L...

Page 15: ...RESSURE CUT OUT MS COMPRESSOR MOTOR CONTACTOR TERMINAL JUNCTION IDENTIFIED TERMINAL COIL TERMINAL BOARD BY OTHERS TERMINAL BOARD BY FACTORY FIELD WIRING FACTORY WIRING RELAY CONTACT N O CAPACITOR PRES...

Page 16: ...OR HPCO HIGH PRESSURE CUT OUT LPCO LOW PRESSURE CUT OUT MS COMPRESSOR MOTOR CONTACTOR SR COMPRESSOR START RELAY TERMINAL JUNCTION IDENTIFIED TERMINAL COIL TERMINAL BOARD BY OTHERS TERMINAL BOARD BY FA...

Page 17: ...IR FLOW DIRECTION 10 4 264 0 20 9 530 6 1 2 30 5 1 4 35 1 27 6 700 0 9 4 239 0 7 3 185 9 4 9 123 5 WIRING IN SUCTION LINE LIQUID LINE NOTES 1 SUCTION AND LIQUID LINES ARE FLARE TYPE CONNECTIONS 2 DIME...

Page 18: ...TTK518PB P1 LIQUID REFRIG LINE DIA MODEL TTK524PB P1 1 4 6 4 3 8 9 5 TTK530PB P1 TTK512PBHEF TTK530KB00F TTK518PBHEF TTK018QB00B TTK024QB00B TTK030QB00D SUCTION 1 2 12 7 5 8 15 9 LIQUID LINE SUCTION L...

Page 19: ...143 5 REFRIG LINE DIA MODEL 3 8 9 5 TTK536K1 K4 TTK536KB KD LIQUID SUCTION TTK042KD K4 3 8 9 5 2 DIMENSIONS INCHES MILIMETERS 1 IN 25 40 MM NOTE 1 SUCTION AND LIQUID VALVES ARE FLARE TYPE CONNECTIONS...

Page 20: ...D LIQUID LINE ARE FLARE TYPE CONNECTIONS TTK512LB LIQUID REFRIG LINE DIA MODEL TTK512L1 TTK518L1 TTK518LB 1 4 6 4 3 8 9 5 TTK524LB TTK524L1 SUCTION 1 2 12 7 5 8 15 9 AIR FLOW DIRECTION LIQUID LINE SUC...

Page 21: ...21 TTK SVN001 EN Layout 14 1 03 10 16 AM 21 Black...

Page 22: ...22 TTK SVN001 EN Notes Layout 14 1 03 10 16 AM 22 Black...

Page 23: ...23 TTK SVN001 EN Notes Layout 14 1 03 10 16 AM 23 Black...

Page 24: ...Bangchalong Bangplee Samutprakarn http www trane com Literature Order Number TTK SVN001 EN 0300 Date November 2012 Supersede February 2003 Trane has a policy of continuous product and product data im...

Reviews: