TK 56701-1-IM-EN
11
SPECTRUM Selection Guide
A
H
E*
D*
G
F*
C
B
RCS1133-2
INSTALLATION COFIGURATIONS
Fig.
Zone 1
Zone 2
Zone 3
2 Zone
Install Kit
801277
REQUIRED
3 Zone
Install Kit
801280
REQUIRED
S-2 + S-2
Jumper Kit
800372
REQUIRED
2 Zone
Tubing Kit
15m (50ft)
720201
OPTION
Transverse
Drain Kit
880041
OPTION
A
S-3
S-3
—
801277 x 1
—
—
720201 x 1
880041 x 2
B
S-2
S-3
—
801277 x 1
—
—
720201 x 1
880041 x 2
C
S-2 + S-2
S-2
—
801277 x 1
—
800372 x 1
720201 x 1
880041 x 3
D*
S-3
S-3
—
801277 x 1
—
—
—
880041 x 2
E*
S-3
S-2
—
801277 x 1
—
—
—
880041 x 2
F*
S-2
S-2
S-2
—
801280 x 1
—
—
880041 x 3
G
S-2
S-2
S-2
—
801280 x 1
—
720201 x 1
880041 x 3
H
S-2
S-2
S-2
—
801280 x 1
—
720201 x 1
880041 x 3
*Configuration will need at least one tube kit if evaporators are mounted in the back of the zone.
IIm
mp
po
orrtta
an
ntt:: T-1090 SPECTRUM units should not be configured with more than six (6) total evaporator fans. Emission
control software will restrict capacity performance if unit is configured with more than six (6) fans.
N
NO
OT
TE
ES
S::
1. S-2 evaporators (902673) include mounting hardware kit (800628).
2. S-3 evaporators (902674) include mounting hardware kit (800628).
3. Two Zone installation require one installation kit (801277).
4. Three Zone installation require one installation kit (801280).
5. Transverse drain kit (880041) is needed to drain on one side toward the front or back of truck.
6. Tubing kit (720201) will be supplied per customer request only.
7. Quantities specified are for entire truck.
8. Evaporators can be placed at the back of each zone, however this may require different refrigerant and drain tube
routing.