Required Tools
1. Protective Eye Wear
2. Drill
3. Drill Bits
4. Tape Measure
5. Hand Saw
6. File
7. Mechanics Tools
8. Torque Wrench
9. Wire Crimper
10. Hose Cutting Tool (204-677)
11. Hose Fitting Tools (204-1045 and 204-1128)
12. Voltmeter
13. Neutral/Alcohol Cure Silicone Sealant (203-436) or equivalent
14. Manifold Gauge Set
15. Evacuation Station
16. Reclaiming Station
17. Electronic Leak Detector
18. Refrigerant and Scale
19. Overhead Crane or Hoist with locking lifting hooks
20. Work Platform (Recommended)
21. Solenoid Valve Magnet (204-1074)
IMPORTANT: Equipment such as scales, gauges, and torque wrenches should be in good working condition and routinely calibrated to assure accurate
readings.
Summary of Contents for Thermo King ES300
Page 12: ...11 Required Tools ...
Page 18: ...17 Dimensions Condenser Module Mounting Holes ...
Page 19: ...18 Dimensions HMI A 140 mm 5 50 in B 46 mm 1 80 in C 12 mm 50 in ...
Page 20: ...19 BLANK PAGE ...
Page 38: ...37 Important Suction Line Routing and P Trap Formation NOT ACCEPTABLE From Unit ...
Page 40: ...39 Installation Refrigeration Tubes to Compressor ...
Page 46: ...45 System Leak Check and Evacuation ...
Page 48: ...47 Installation Electrical Connections ...
Page 50: ...49 Electrical Connections Evaporator s ...
Page 52: ...51 Installation Standby Power Receptacle ...
Page 54: ...53 Installation Drain Hoses REMOTE Evaporator HOST Evaporator Defrost Heater Wires ...
Page 56: ...55 Installation HMI ...
Page 62: ...61 System Charging AMOUNT OF REFRIGERANT PER MODEL Model 50 5 00 lbs ...