Trane SRUB Installation Operation & Maintenance Download Page 1

Installation
Operation
Maintenance

Air-Cooled Self Contained

Air Conditioner 7.5-20 Tons
SRUB Model 50Hz

Jan 2002

SRUB-IOM001-EN

Single Compressor

Dual Compressors

SRUB 080

SRUB 160

SRUB 110

SRUB 190

SRUB 130

SRUB 220
SRUB 250

Summary of Contents for SRUB

Page 1: ...Operation Maintenance Air Cooled Self Contained Air Conditioner 7 5 20 Tons SRUB Model 50Hz Jan 2002 SRUB IOM001 EN Single Compressor Dual Compressors SRUB 080 SRUB 160 SRUB 110 SRUB 190 SRUB 130 SRUB...

Page 2: ...ervice Digit Minor Design Sequence Factory Installed Options 01 Arrangement 1 02 Arrangement 2 03 Arrangement 3 04 Arrangement 4 Electrical Characteristics D 380 415 3 50 Compressor A Single Compresso...

Page 3: ...plication Considerations 5 Outline For Installation 6 General Information 8 Installation 9 Unit Installation 10 Installation Checklist 11 Refrigerant Charging and Evacuation 12 Electrical Wiring 14 El...

Page 4: ...Ft 9 06 12 5 12 5 17 22 17 22 20 14 20 14 No of Refrigeration Circuit 1 1 1 2 2 2 2 COMPRESSOR RLA LRA 16 4 95 0 19 2 125 0 19 6 125 0 16 4 95 0 16 4 95 0 19 2 125 0 19 6 125 0 19 2 125 0 Internal Ove...

Page 5: ...PLENUM USING EQUIPMENT ROOM ARRANGEMENT 4 ARRANGEMENT 3 SUPPLY AIR SUPPLY AIR SUPPLY AIR SUPPLY AIR SUPPLY AIR SUPPLY AIR FRESH AIR IN CONDENSER AIR OUT CONDENSER AIR IN SUPPLY AIR RETURN AIR UNIT LOC...

Page 6: ...D E D 1 2 H J I 2 5 16 1 1 2 9 16 7 13 16 5 10 5 16 12 13 16 4 1 8 3 4 KNOCKOUT FOR CONTROL WIRING BOTH ENDS 1 1 4 KNOCKOUT FOR UNIT POWER BOTH ENDS 3 4 F P T CONDENSATE DRAIN CONN THIS END F PILOT RE...

Page 7: ...nch A D E D F F J I H 4 1 8 5 7 13 16 10 5 16 12 13 16 2 5 16 1 1 2 9 16 3 4 F P T CONDENSATE DRAIN CONN THIS END 3 4 KNOCKOUT FOR CONTROL WIRING BOTH ENDS 1 1 4 KNOCKOUT FOR UNIT POWER BOTH ENDS PILO...

Page 8: ...and maintenance accessibility and an improved accessory line They are of the vertical or horizontal discharge with the vertical standard Note Warnings and Cautions appear at appropriate places in this...

Page 9: ...the unit cabinet or damaging the unit finish Figure 1 Space Requirement for SRUB Model Table 1 Show Space Requirement for SRUB Model Inspection Checklist To protect against loss due to damage incurre...

Page 10: ...tioner 2 Allow minimum recommended clearances for maintenance and routine service Refer to Service Data See in figure 1 3 Available power supply must agree with electrical data on component nameplate...

Page 11: ...ion of drain pan outlet Unit properly mounted on isolators if used Compressor and supply fan properly isolated Unit protective shipping covers removed Component Overview Fan and motor shafts are paral...

Page 12: ...ready to operate Procedure 1 Open liquid valve that refrigerant go through system and open suction valve 2 Turn on power to the unit Allow the system to run for five to ten minutes to stabilize operat...

Page 13: ...t charge has entered the system At this point close the liquid line charging valve and the refrigerant cylinder 5 Allow the system to continue to operate frequently checking the liquid line sight glas...

Page 14: ...14 SRUB IOM001 EN Electrical Wiring...

Page 15: ...SRUB IOM001 EN 15 Electrical Wiring...

Page 16: ...16 SRUB IOM001 EN Electrical Wiring...

Page 17: ...SRUB IOM001 EN 17 Electrical Wiring...

Page 18: ...nce or phase rotation This is determined by the direction of rotation of the alternator When rotation is clockwise phase sequence is usually called ABC when counterclockwise CBA This direction may be...

Page 19: ...on Compressor cannot compress the refrigerant Pressure will not increase at high pressure side Compressor will operate loudly The current Amps will be lower Switch two line leads on 1TB and check agai...

Page 20: ...pressor motors Voltage Imbalance Excessive voltage imbalance between phases in a three phase system will cause motors to overheat and eventually fail Maximum allowable imbalance is 2 percent Voltage i...

Page 21: ...ion 3 Turn the rotary switch of the thermostat field supplied to cool position Operation Unit is operated by positioning the fan switch at cool Please ensure there are at least a minimum of 50 design...

Page 22: ...spect clean and tighten all electrical connections Inspect the TXV sensing bulbs for cleanliness good contact with suction line and insulated from ambient Check superheat setting of TXV It should be 1...

Page 23: ...Check the fan motor sheave alignment with a straightedge or a tightly pulled string For sheaves of different widths place a string in the center groove of each sheave and pull it tight for a center l...

Page 24: ...ling demand or when dirty conditions prevail A routine cleaning schedule minimum of once per year is recommended to prevent dirt buildup in the coil fins where it may not be visible Remove large debri...

Page 25: ...SRUB IOM001 EN 25 Note...

Page 26: ...26 SRUB IOM001 EN Note...

Page 27: ...oad Samrong Tai Samutprakarn 10130 http www trane com An American Standard Company Literature Order Number SRUB IOM001 EN New Stocking Location Bangkok Thailand 35 8 10130 Since The Trane Company has...

Reviews: