RAUP Trane Air Cooled Condensing Unit
This list must checked off by the installer to ensure correct installation before the unit start up.
Unit acceptance
Check for damage, if any, on transportation
Check for equipment shipped against delivery slip
Check lifting system
Unit positioning
Remove packaging
Check position of unit
Check unit is level
Check clearance around condenser
Check clearance required for maintenance access
Check position of rubber pads
Refrigerant circuit
Check filter dryer and sight glass presence
Check oil traps presence on discharge line (if there vertical risers>3m)
Check pitch for horizontal lines (1cm/m)
Check refrigerant presence
Electrical equipment
Check direction of rotation of compressors and fan motors
Check installation and rating of mains power switch/fuse
Check that electrical connections comply with specification
Check that electrical connections match information on manufacturer’s identification plate
Check electrical connections and connections to mains power switch
General
Check available cooling charge (50% of rated installation load)
Check with other handling installation works
Comments:........................................................................................................................................................................
..........................................................................................................................................................................................
..........................................................................................................................................................................................
..........................................................................................................................................................................................
Signature: ................................................. Name ............................................................................................................
Order No ...........................................................................................................................................................................
Work site:..........................................................................................................................................................................
Please return to your Trane Service Agency
Installation Checklist
30