18
Installation (Continued)
spacer located between the compressor rails and the
unit base rail as illustrated in the “Tiedown Bolt” detail.
2. Remove the bolt in each rubber isolator and the slotted
shipping spacer located between the compressor rails
and the unit base rail as illustrated in the “Isolator Bolt”
detail. Reinstall each isolator bolt into the rubber isolator
and screw it two to three turns into the base rail.
3. Ensure that the compressor rail assembly is free to move
on the rubber isolators.
Four Manifolded Compressors
Each manifolded compressor assembly is rigidly bolted to a
mounting rail assembly. The rail assembly sets on eight (8)
rubber isolators. The assembly is held in place by six (6)
shipping “Tiedown” bolts. To remove the shipping hardware,
follow the procedures below:
1. At each “Tiedown” location (3 front and 3 rear), remove
and discard the tiedown bolt and the slotted shipping
spacer located between the compressor rails and the
unit base rail as illustrated in the “Tiedown Bolt” detail.
2. Remove the bolt in each rubber isolator and the slotted
shipping spacer located between the compressor rails
and the unit base rail as illustrated in the “Isolator Bolt”
detail. Reinstall each isolator bolt into the rubber isolator
and screw it two to three turns into the base rail.
3. Ensure that the compressor rail assembly is free to move
on the rubber isolators.
Figure 3-5A
Removing C80 Scroll Compressor Shipping Hardware
Figure 3-5B
Removing D10 & D12 Scroll Compressor Shipping Hardware
Summary of Contents for RAUC-IOM-15
Page 8: ...8 Figure 3 2A RAUC C80 Unit Dimensional Data Recommended Clearances...
Page 9: ...9 Figure 3 2A Continued RAUC D10 Unit Dimensional Data Recommended Clearances...
Page 10: ...10 Figure 3 2A Continued RAUC D12 Unit Dimensional Data Recommended Clearances...
Page 11: ...11 Figure 3 2B EVPB C80 Evaporator Chiller Dimensions...
Page 12: ...12 Figure 3 2B Continued EVPB D10 Evaporator Chiller Dimensions...
Page 13: ...13 Figure 3 2B Continued EVPB D12 Evaporator Chiller Dimensions...
Page 14: ...14 Figure 3 2B Continued EVPB C80 through D12 Chill Water Pipe Stubout Dimensions...
Page 35: ...35 Installation Continued Field Connection Diagram Notes for all System Control Options...
Page 57: ...57 Figure 5 5 Typical Scroll Compressor Terminal Block System Start Up Continued...
Page 67: ...67...
Page 68: ...68...