15
RAU-SVX01B-E4
INSTALLATION CHECKLIST
RAUL Trane Air Cooled Condensing Unit
This list must be checked off by the installer to ensure correct installation before the unit starts up.
Unit acceptance
❏
Check for damage, if any, on transportation
❏
Check for equipment shipped against delivery slip
❏
Check lifting system
Unit positioning
❏
Remove packaging
❏
Check position of unit
❏
Check unit is level
❏
Check clearance around condenser
❏
Check clearance required for maintenance access
❏
Check position of rubber pads
Refrigerant circuit
❏
Check filter dryer and sight glass presence
❏
Check oil traps presence on discharge line (if there vertical risers>3m)
❏
Check pitch for horizontal lines (1cm/m)
❏
Check refrigerant presence
Electrical equipment
❏
Check direction of rotation of compressors and fan motors
❏
Check installation and rating of mains power switch/fuse
❏
Check that electrical connections comply with specification
❏
Check that electrical connections match information on manufacturer's identification plate
❏
Check electrical connections and connections to mains power switch
General
❏
Check available cooling charge (50% of rated installation load)
❏
Check with other trades handling installation works
Comments: ........................................................................................................................................................................................
............................................................................................................................................................................................................
............................................................................................................................................................................................................
............................................................................................................................................................................................................
Signature: ............................................................Name ..................................................................................................................
Order N° ..........................................................................................................................................................................................
Work site: ..........................................................................................................................................................................................
Please return to your local Trane Service Agency
Summary of Contents for RAU-SVX01B-E4
Page 27: ...27 RAU SVX01B E4 Notes...