32
18-GE20D1-1E-EN
Sequence of Operation
N
No
otte
e:: The seven segment LED readout is based on
thermostat input.
N
No
otte
e:: Some units will show demand airflow while
others will show calculated airflow. Calculated
airflow will gradually ramp up and may take ~1-2
minutes to stabilize.
E
EA
AC
C a
an
nd
d H
HU
UM
M T
Tiim
miin
ng
g
•
EAC relay closes approximately 2 seconds after the
blower starts.
•
EAC relay opens when the blower motor stops.
•
HUM relay closes on any heating call (HP)
approximately 1 second after the blower motor
starts.
•
HUM relay opens when any heating call (HP) is
removed.
S
Siin
ng
glle
e S
Stta
ag
ge
e C
Co
oo
olliin
ng
g
1. R-Y1-G contacts on the thermostat close sending
24VAC to the Y1 and G low voltage terminals on the
IMBC. Technician should read 24VAC between Y1-
B/C and between G-B/C.
N
No
otte
e:: Factory supplied Y1-O jumper must remain in
place for proper seven segment LED readout.
If removed, seven segment LED will read
“
HP1
”.
2. 24VAC is sent to the OD unit via thermostat wiring
energizing 1
st
stage compressor operation.
3. The indoor blower ramps to the 1
st
stage cooling
airflow. The seven segment LED for example will
alternately read:
CL1
= Cooling, Stage 1
ARF
= Airflow
080
= 800 calculated cfm (value shown x 10)
4. When the temperature is lowered enough to satisfy
the thermostat setting, contacts R-Y1-G will open.
The OD unit shuts off and the indoor blower shuts
off, unless a blower off delay has been enabled in
the IMBC setup menu options. The seven segment
LED will read “
IDL
” = Idle, no thermostat demand.
T
Tw
wo
o S
Stta
ag
ge
e C
Co
oo
olliin
ng
g
1. See sequence of operation for Single stage cooling
operation above (see steps 1-4).
2. R-Y2 contact on the thermostat closes sending
24VAC to Y2 low voltage terminal on the IMBC.
Technician should read 24VAC between Y2 and B/C.
3. 24VAC is sent to the OD unit via thermostat wiring.
4. The indoor airflow ramps to 2
nd
stage cooling
airflow. The seven segment LED for example will
read:
CL2
= Cooling, Stage 2
ARF
= Airflow
160
= 1600 calculated cfm (value shown x 10)
5. When the temperature is lowered enough to satisfy
the thermostat setting, contacts R-Y1-Y2-G will
open.
6. The OD unit shuts off and the indoor blower shuts
off, unless a blower off delay has been enabled in
the IMBC setup menu options. The seven segment
LED will read “
IDL
” = Idle, no thermostat demand.
S
Siin
ng
glle
e S
Stta
ag
ge
e H
He
ea
att P
Pu
um
mp
p
1. R-Y1-G contacts on the thermostat close sending
24VAC to the Y1 and G low voltage terminals on the
IMBC. Technician should read 24VAC between Y1-
B/C and between G-B/C.
N
No
otte
e:: Factory supplied Y1-O jumper must be
removed for proper seven segment LED
readout. If left in place, seven segment LED
will read “
CL1
”.
2. 24VAC is sent to the OD unit via thermostat wiring
energizing 1
st
stage compressor operation.
3. The indoor blower ramps to the 1
st
stage heat
pump airflow. The seven segment LED for example
will alternately read:
HP1
= Heat Pump heating, Stage 1
ARF
= Airflow
080
= 800 calculated cfm (value shown x 10)
4. When the temperature is raised enough to satisfy
the thermostat setting, contacts R-Y1-G will open.
The OD unit shuts off and the indoor blower shuts
off, unless a blower off delay has been enabled in
the IMBC setup menu options. The seven segment
LED will read “
IDL
” = Idle, no thermostat demand.
T
Tw
wo
o S
Stta
ag
ge
e H
He
ea
att P
Pu
um
mp
p
1. See sequence of operation for Single stage heat
pump operation above (see steps 1-4).
2. R-Y2 contact on the thermostat closes sending
24VAC to Y2 low voltage terminal on the IMBC.
Technician should read 24VAC between Y2 and B/C.
3. 24VAC is sent to the OD unit via thermostat wiring
energizing 2
nd
stage compressor operation.
4. The indoor blower ramps to the 2
nd
stage heat
pump airflow. The seven segment LED for example
will alternately read:
HP2
= Heat Pump heating, Stage 2
ARF
= Airflow
160
= 1600 calculated cfm (value shown x 10)
Summary of Contents for P0V0 Series
Page 9: ...18 GE20D1 1E EN 9 Outline Drawings Table 3 14 5 Width Cabinet ...
Page 10: ...10 18 GE20D1 1E EN Table 4 17 5 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Page 11: ...18 GE20D1 1E EN 11 Table 5 21 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...
Page 12: ...12 18 GE20D1 1E EN Table 6 24 5 Width Cabinet O Ou ut tl li in ne e D Dr ra aw wi in ng gs s ...