3-2. PIPE CONNECTION

1) Apply a thin coat of refrigeration oil (G) to the flared ends of the pipes and 

the pipe connections of the outdoor unit.

2) Align the center of the pipe with that of the pipe connections of the outdoor 

unit, then hand tighten the flare nut 3 to 4 turns.

3) Tighten the flare nut with a torque wrench as specified in the table.

•  Over-tightening may cause damage to the flare nut, resulting in refrigerant 

leakage.

•  Be sure to wrap insulation around the piping. Direct contact with the bare 

piping may result in burns or frostbite.

3-3. INSULATION AND TAPING

1) Cover piping joints with pipe cover.

2) For outdoor unit side, surely insulate every piping including valves.

3) Using piping tape (E), apply taping starting from the entry of outdoor unit.

•  Stop the end of piping tape (E) with tape (with adhesive agent attached).

•  When piping have to be arranged through above ceiling, closet or where 

the temperature and humidity are high, wind additional commercially sold 

insulation to prevent condensation.

 

WARNING

When installing the unit, securely 

connect the refrigerant pipes before 

starting the compressor.

 

CAUTION

When there are the ports which are 

not used, make sure their nuts are 

tightened securely.

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

Tilted Uneven Burred

Good

No good

Burr

Copper pipe

Spare reamer

Pipe cutter

Smooth all 

around

Even length 

all around

Inside is shin-

ing without any 

scratches.

B

Flare nut

Die

Copper pipe

Clutch type

Flaring tool

Wing nut type

Copper 

pipe

3-1. FLARING WORK

1) Cut the copper pipe correctly with pipe cutter. (Fig. 1, 2)

2) Completely remove all burrs from the cut cross section of 

pipe. (Fig. 3)

•  Aim the copper pipe downward while removing burrs to 

prevent burrs from dropping in the pipe.

3) Remove flare nuts attached to indoor and outdoor units, 

then put them on pipe having completed burr removal. 

(Not possible to put them on after flaring work.) 

4) Flaring work (Fig. 4, 5). Firmly hold copper pipe in the 

dimension shown in the table. Select A inch (mm) from 

the table according to the tool selected.

5) Check 

•  Compare the flared work with Fig. 6.

•  If flare is noted to be defective, cut off the flared section 

and do flaring work again.

4-1. PURGING PROCEDURES AND LEAK TEST

1) Remove service port cap of stop valve on the side of the outdoor unit gas pipe. 

(The stop valves are fully closed and covered in caps in their initial state.)

2) Connect gauge manifold valve and vacuum pump to service port of stop valve 

on the gas pipe side of the outdoor unit.

3) Run the vacuum pump. (Vacuumize for more than 15 minutes.)

4) Check the vacuum with gauge manifold valve, then close gauge manifold 

valve, and stop the vacuum pump.

5) Leave as it is for one or two minutes. Make sure the pointer of gauge manifold 

valve remains in the same position. Confirm that pressure gauge shows 

14.7 

psi [Gauge] (

0.101 MPa).

6) Remove gauge manifold valve quickly from service port of stop valve.

7) Fully open all stop valves on the gas pipe and the liquid pipe. Operating 

without fully opening lowers the performance and this causes trouble.

8) Refer to 1-2., and charge the prescribed amount of refrigerant if needed. Be 

sure to charge slowly with liquid refrigerant. Otherwise, composition of the 

refrigerant in the system may be changed and affect performance of the air 

conditioner.

9) Tighten cap of service port to obtain the initial status.

10) Leak test

Gauge mani-

fold valve (for 

R410A)

Compound pressure 

gauge (for R410A)

–14.7 psi

(–0.101MPa)

Handle 

Low

Handle High

Vacuum pump

(for R410A)

Charge hose 

(for R410A)

*Close

*Open

Hexagonal wrench

*4 to 5 turns

Stop valve 

for LIQUID

Pressure gauge

(for R410A)

Precautions when us-

ing the control valve

When attaching the control valve 

to the service port, valve core may 

deform or loosen if excess pres-

sure is applied. This may cause 

gas leak.

Service port

Charge hose 

(for R410A)

Body

Close Open

Control valve

A

When attaching the control valve to 

the service port, make sure that the 

valve core is in closed position, and 

then tighten part A. Do not tighten 

part A or turn the body when valve 

core is in open position.

Pipe diameter  

[inch (mm)]

[inch (mm)]

A [inch (mm)]

Tightening torque

Clutch type tool for R410A Clutch type tool for R22

Wing nut type tool for R22

ft-Ib

N•m

kgf•cm

1/4 (ø6.35)

21/32 (17)

0 to 0.02

(0 to 0.5)

0.04 to 0.06

(1.0 to 1.5)

0.06 to 0.08

(1.5 to 2.0)

10 to 13

13.7 to 17.7

140 to 180

3/8 (ø9.52)

7/8 (22)

25 to 30

34.3 to 41.2

350 to 420

1/2 (ø12.7)

1-1/32 (26)

0.08 to 1.0

(2.0 to 2.5)

36 to 42

49.0 to 56.4

500 to 575

5/8 (ø15.88)

1-5/32 (29)

54 to 58

73.5 to 78.4

750 to 800

Stop valve cap

(Torque 15 to 

22 ft-lb, 19.6 to 

29.4 N•m, 200 

to 300 kgf•cm)

Service port cap

(Torque 10 to 13 ft-lb, 

13.7 to 17.7 N•m, 140 

to 180 kgf•cm)

Stop valve 

for GAS

4.  PURGING PROCEDURES, LEAK TEST, AND TEST RUN

3.  FLARING WORK AND PIPE CONNECTION

WG79A765H01_01En.indd   5

2018/08/03   9:41:30

Summary of Contents for Mitsubishi Electric NTXMMX24A132A Series

Page 1: ...tion de l appareil extérieur Lors de l installation de l appareil intérieur consultez la notice d installation de cet appareil Toute altération structurelle requise pour l installation doit être conforme aux exi gences du code du bâtiment local Manual de instalación Para el INSTALADOR En este manual sólo se describe la instalación de la unidad exterior Para instalar la unidad interior consulte el ...

Page 2: ...than R22 Not using appropriate tools or materials and incomplete installation could cause the pipes to burst or injury When pumping down the refrigerant stop the compressor before discon necting the refrigerant pipes If the refrigerant pipes are disconnected while the compressor is running and the stop valve is open air could be drawn in and the pressure in the refrigera tion cycle could become ab...

Page 3: ...ont blowing side open As long as space indicated in the figure is provided it is allowed to install the unit where obstacles are behind and on the sides of the unit No obstacle above the unit FREE SPACE REQUIRED AROUND OUTDOOR UNIT Service space When installing the unit in an area that is enclosed with walls such as a verandah be sure to have enough space as shown below In this case the air condit...

Page 4: ...hole sleeve 1 L Soft PVC hose 19 32 in 15 mm inner diameter or hard PVC pipe VP16 for drain socket 1 1 Note Place indoor outdoor unit connecting wire B and power supply cord A at least 3 ft 1 m away from the TV antenna wire The Q ty for B to K in the above table is quantity to be used per indoor unit More than 3 15 16 in 100 mm Open as a rule More than 19 11 16 in 500 mm if the front and both side...

Page 5: ...d A 9 Close the service panel securely Make sure that 3 2 PIPE CONNEC TION is completed Connecting order Connect the terminal block in following order A B C D P CONNECTING WIRES AND CONNECTING GROUND WIRE Use solid conductor Min AWG14 or stranded conductor Min AWG14 Use double insulated copper wire with 600 V insulation Use copper conductors only Follow local electrical code POWER SUPPLY CABLE AND...

Page 6: ...ves are fully closed and covered in caps in their initial state 2 Connect gauge manifold valve and vacuum pump to service port of stop valve on the gas pipe side of the outdoor unit 3 Run the vacuum pump Vacuumize for more than 15 minutes 4 Check the vacuum with gauge manifold valve then close gauge manifold valve and stop the vacuum pump 5 Leave as it is for one or two minutes Make sure the point...

Page 7: ...t is Not completed press the piping wiring correction switch SW871 again to cancel this function Then confirm the wiring and piping combination in a conventional manner by operating the indoor units one by one The operation is done while the power is supplied Make sure not to contact parts other than the switch including the P C board This may cause electric shock or burn by hot parts and live par...

Page 8: ...n manual about the method for stopping the operation If too much refrigerant has been added to the air conditioner system the pressure may not drop to 0 1 to 0 psi Gauge 0 05 to 0 MPa or the protection function may operate due to the pressure increase in the high pressure refrigerant circuit If this occurs use a refrigerant collecting device to collect all of the refrigerant in the system and then...

Page 9: ...tmosphère En cas de fuite de réfrigérant pendant l installation aérez la pièce Tout contact entre le réfrigérant et une flamme pourrait provoquer l émission de gaz toxiques Des fuites de réfrigérant peuvent provoquer une asphyxie Aérez la pièce A la fin de l installation aucune fuite de réfrigérant ne doit être présente sur le circuit En cas de fuite de réfrigérant dans une pièce et si le réfrigér...

Page 10: ...se veillez à observer les instructions ci dessous N installez jamais l unité externe dans un endroit où le côté présentant l entrée la sortie d air risque d être directement exposé au vent Pour protéger l unité externe du vent installez la de façon à ce que l entrée d air soit face au mur Pour éviter toute exposition au vent il est recommandé d installer un écran de protection du côté de la sortie...

Page 11: ... un mur contenant des métaux de l étain p ex ou un treillis métallique utiliser un morceau de bois traité d une épais seur de 25 32 po 20 mm minimum entre le mur et la tuyauterie ou isoler la tuyauterie en lui appliquant 7 à 8 couches de ruban isolant en vinyle Pour utiliser la tuyauterie existante effectuer un cycle COOL REFROI DISSEMENT de 30 minutes et lancer l aspiration avant de procéder à la...

Page 12: ...CÂBLE D ALIMENTATION ÉLECTRIQUE ET CÂBLE DE MISE À LA TERRE Utiliser un conducteur massif ou toronné min AWG12 Utiliser des conducteurs en cuivre uniquement Respecter le code électrique local AVERTISSEMENT Utiliser le câble de connexion conforme aux normes techniques pour raccorder les unités interne et externe et fixer le câble fermement sur la bloc de sortie de façon que le côté raccordement de ...

Page 13: ... ouverture de service pour recréer les conditions d origine 10 Test de contrôle des fuites 3 2 RACCORDEMENT DES TUYAUX 1 Appliquez une fine couche d huile réfrigérante G sur les embouts évasés des tuyaux ainsi que sur les raccords de tuyau de l appareil extérieur 2 Alignez la partie médiane du tuyau sur les raccords de tuyau de l appareil extérieur et serrez les écrous évasés à la main de 3 à 4 to...

Page 14: ...rotection contre la remise en marche à trop brève échéance s enclenche Le compresseur restera arrêté trois minutes avant de se remettre en marche afin de protéger le climatiseur Fonction de correction de câblage tuyauterie L appareil est équipé d une fonction qui permet de corriger les branchements de câblage et de tuyauterie En cas de branchement incorrect de câblage et de tuyauterie ou de problè...

Page 15: ...llation de l appareil intérieur pour la méthode d arrêt du système Si trop de réfrigérant a été ajouté au système de climatisation il se peut que la pression ne parvienne pas à baisser jusqu à 0 1 à 0 psi jauge 0 05 à 0 MPa ou la fonction de protection pourrait se déclencher en raison de la montée de pression dans le circuit de réfrigérant à haute pression Dans ce cas utilisez un dispositif de col...

Page 16: ...mecánicos malfuncionamiento del sistema o averías en la unidad En el peor de los casos esto podría llegar a ser un serio impedimento para garantizar el uso seguro del producto No descargue el refrigerante en el ambiente Si se producen fugas de refrige rante durante la instalación ventile la habitación Si el refrigerante entra en contacto con una llama podría generarse gas nocivo La pérdida de refr...

Page 17: ...a baja observe las instrucciones siguientes No instale nunca la unidad exterior en un lugar en el que el lado de entra da salida de aire quede expuesto directamente al viento Para evitar la exposición al viento instale la unidad exterior con el lado de entrada de aire hacia la pared Para evitar la exposición al viento se recomienda instalar una placa de flectora en el lado de salida de aire de la ...

Page 18: ... y ambos lados están abiertos Después de la prueba de fugas aplique material aislante de modo que no queden huecos Cuando los tubos deban instalarse en una pared con contenido metálico placas de latón o rejillas metálicas ponga un trozo de madera tratada químicamente de 25 32 pulg 20 mm o más de grosor entre la pared y los tubos o envuelva los tubos con 7 u 8 vueltas de cinta aislante de vinilo Pa...

Page 19: ...amente conductores de cobre Siga la normativa eléctrica local CABLE DE ALIMENTACIÓN Y CABLE DE TIERRA Utilice un conductor sólido o trenzado con un calibre mín AWG12 Use únicamente conductores de cobre Siga la normativa eléctrica local ATENCIÓN Conecte las unidades interior y exterior con el cable de conexión normalizado destinado a este fin y sujete bien el cable al panel de terminales de modo qu...

Page 20: ...a de servicio de la válvula de retención situada en el lado de la tubería de gas de la unidad exterior Inicialmente las válvulas de retención están completamente cerradas y cubiertas con sus tapas 2 Conecte la válvula colectora de manómetro y la bomba de vacío al puerto de servicio de la válvula de retención en el lado de la tubería del gas de la unidad exterior 3 Ponga en funcionamiento la bomba ...

Page 21: ...iva de forma que el compresor no vuelve a ponerse en funcionamiento durante 3 minutos para proteger el acondicionador de aire Función de corrección de conexiones tuberías Esta unidad tiene una función de corrección de conexiones tuberías que corrige la combinación de las mismas Cuando exista la posibilidad de una combinación de conexiones y tuberías incorrecta y resulte difícil confirmarla use est...

Page 22: ...lte el manual de instalación de la unidad interior para más detalles acerca del método de detención de la opera ción Si se ha añadido demasiado refrigerante al sistema con acondicionador de aire puede que la presión no baje de 0 1 a 0 psi manómetro de 0 05 a 0 MPa o que la función de protección se ponga en funcionamiento debido a la subida de presión en el circuito de refrigeración de presión elev...

Page 23: ...A4_white_tombo indd 1 2018 08 09 14 11 29 ...

Page 24: ...WG79A765H01 HEAD OFFICE 1340 SATELLITE BOULEVARD SUWANEE GA 30024 USA MITSUBISHI ELECTRIC TRANE HVAC US LLC WG79A765H01_cover4 indd 2 2018 08 02 18 28 25 Publication No DL SVN041A XX Published Dec 2018 ...

Reviews: