Leak Check and System Evacuation

Leak Check

After the connection operation of
refrigerant lines to both the outdoor
and indoor unit is completed, the field
brazed connections must be checked
for leaks. Pressurize the system
through the service valve with dry
nitrogen to 250 psi. Use soap
bubbles or other leak-checking
methods to ensure that all field joints
are leak free. If not, release pressure,
repair and repeat leak test.

System Evacuation

1. After completion of leak check,

evacuate the system.

2. Attach appropriate hoses from

manifold gauge to gas and liquid
line pressure taps.

Note:

 Unnecessary switching of

hoses can be avoided and
complete evacuation of all lines
leading to sealed system can be
accomplished with manifold
center hose and connecting
branch hose to a cylinder of
R-22 and vacuum pump.

3. Attach center hose of manifold

gauges to vacuum pump.

4. Evacuate the system to hold a

350 micron vacuum.

5. Close off valve to vacuum pump

and observe the micron gauge.
If gauge pressure rised above
500 microns in one (1) minute,
then evacuation is incomplete or
the system has a leak.

6. If vacuum gauge does not rise

above 500 microns in one (1)
minute, the evacuation should
be complete.

7. With vacuum pump and micron

gauge blanked off, open valve on
R-22 cylinder and allow refrigerant
pressure to build up to about 40
psig.

8. Close valve on the R-22 supply

cylinder. Close valves on manifold
gauge set and remove refrigerant
charging hoses from liquid and
gas gauge ports.

9. Leak test the entire system. Using

proper procedures and caution,
repair any leaks found and repeat
the leak test.

Refrigerant Charging Procedure

Charge refrigerant through the gauge
port on the liquid line until pressure at
gauge is up to 120-150 psi. Once the
charge enters the system, backseat
(open) the liquid line service valve and
disconnect the charging line and
replace the cap on the gauge port.

Gaseous Charging

This procedure is accomplished
with the unit operating. Electrical
connections must be complete.
Do not proceed until the system is
ready to operate.

Procedure

1. Connect R-22 drum with gauge

manifold to the Schrader valves
(pressure taps) on the compressor
discharge and suction lines.

2. Turn on power to the unit. Allow

the system to run for five to ten
minutes to stabilize operating
conditions.

3. Once proper airflow is established,

observe the suction and head
pressure gauges on the gauge
manifold. Pressure reading should
fall approximately at the normal
points. Add or remove refrigerant
(gas only) as required to obtain
correct head and suction pressures.
Check suction line superheat and
condenser sub-cooling to ensure
the unit is operating properly.

4. Disconnect all power to the unit.
5. Remove the charging system from

the unit and close the opening in
the bottom of the control box with
the pivotal cover before attempting
to replace access panel.

Liquid pressure

Suction pressure

Vacuum pump

R-22

Service hose

Liquid line

Suction

line

Electrical connection

Figure 16

Summary of Contents for MCC 048 ZB

Page 1: ...MCC SVN02A EN Models Cooling Only MCC 518 ZB MCC 524 ZB MCC 530 ZB MCC 536 ZB MCC 048 ZB October 2007 Installation Manual Split System 18 000 48 000 Btu h Under ceiling T ype MCC Series 50 Hz CASSETTE...

Page 2: ...ry If any concealed damage is discover ed send a r egister ed letter of pr otest to the carrier within 7 days of delivery and notify the dealer Warning Warnings ar e provided at appr opriate places in...

Page 3: ...MCC SVN02A EN 3 Contents...

Page 4: ...a space is more than 100 cm as shown in figure 1 also ensure that the position dose not interfere with light fitting sprinkle head etc Determine the ceiling hole by using the paper pattern Determine...

Page 5: ...asy access to check and to maintain Ensur e the spaces indicated by arrows fr om the wall ceiling fence or other obstacles Caution Installation in the following places may cause pr oblems If it is una...

Page 6: ...ent dust or water from getting into the tubes before they are used 8 Be sure to apply refrigerant lubricant to the matching surfaces of the flare and union before connecting them together This is effe...

Page 7: ...valves on manifold gauge set and remove refrigerant charging hoses from liquid and gas gauge ports 9 Leak test the entire system Using proper procedures and caution repair any leaks found and repeat...

Page 8: ......

Page 9: ...MCC SVN02A EN 9 Wiring Diagram OUTDOOR CASSETTE 18000 Btu h 24000 Btu h 220 240 1 50 Hz 380 420 3 50 Hz MCC518 048ZB...

Page 10: ...MCC SVN02A EN 10 Wiring Diagram OUTDOOR CASSETTE 30000 Btu h...

Page 11: ...MCC SVN02A EN 11 Wiring Diagram OUTDOOR CASSETTE 36 000 Btu h 48 000 Btu h 36 000 48 000...

Page 12: ...ion brackets C Height of condensate drain above ceiling D Pipe exit position Model 950 390 340 512 330 370 350 CEILING HOLES 860 890 418 785 drainpipe outlet 850 60 main cable entry B C D 22 refrigera...

Page 13: ...MCC SVN02A EN 13 Notes...

Page 14: ...Trane has a policy of continuous product and product data implement and reserves the right to change design and specifications without notice New...

Reviews: